|
1. The Material Scope Of The Investment Entitled Construction And Reconstruction Of The Municipal Road Ul. Leśna In Porosły. The Scope Of Construction Works Includes: - Construction Of The Road, - Reconstruction Of The Intersection, - Construction And Reconstruction Of Exits, - Construction Of Sidewalks And Roadsides, - Construction Of A Storm Sewage System, Construction Of Drainage, - Reconstruction Of The Power Grid, - Construction And Reconstruction Of Street Lighting, - Construction Technological Channel, Reconstruction Of The Telecommunications Network, Cutting Down Trees And Bushes, Implementation Of Elements Of Permanent Traffic Organization, 2.Detailed Requirements For The Substantive Implementation Of The Task: - Exit Surfaces Made Of Concrete Cubes, Brick Pattern, Thickness. 8 Cm - Red Color, Surfaces Of Pedestrian Sidewalks Made Of Concrete Cubes, Brick Pattern, Thickness. 8 Cm - Gray Color, - During The Construction Period, The Contractor Will Dismantle The Elements Of The City Information System And Reassemble Them After The Completion Of The Works, - The Dismantled Elements Of Vertical Street Markings Will Be Handed Over By The Contractor To The Ordering Party, - The Excavation Material Will Be Deposited By The Contractor In A Place Indicated By The Ordering Party At A Distance Of Up To 5 Km From The Construction Site, - The Materials Obtained From Demolitions Will Be Disposed Of By The Contractor At Its Own Expense; Will Provide Access To Properties Serviced From Ul. Leśna In Porosły - Interruptions In Communication Are Allowed For Up To 48 Hours, Provided That The Owners/Users Of The Properties Located At The Above-Mentioned Premises Are Informed About This Fact In Advance. Streets; The Contractor Will Develop A Project For Temporary Traffic Organization For The Duration Of Construction And Will Organize A Detour Around The Construction Site Via Other Roads In Consultation With Their Managers.2.1. Sewage Pumping Station: - The Employer Informs That The Design Documentation Constituting The Basis For The Investment Was Developed Assuming The Relocation Of The Existing Sewage Pumping Station Outside The Designed Road. However, Due To The Construction Of A New Sewage Pumping Station, The Original Planned Relocation Of The Existing Facility Was Abandoned, And It Remains In Its Current Location, Within The Planned Road. Due To The Above, The Contractor Is Obliged To Take Into Account The Existing Sewage Pumping Station During The Implementation Of Road Works, In Particular By Making The Necessary Height Adjustment Of Its Elements, Including Manholes, Covers And Other Infrastructure Elements To The Designed Elevations Of The Road Surface, Replacing The Old Sewage Pumping Station With A New Vent Installation In The Fenced And Paved Area Of The New Pumping Station, Replacing The Manhole Of The Old Sewage Pumping Station Located In The Designed Road With A Manhole Cast Iron, Class D400, Dimensions 800X800 Mm With A Grate Protecting
|