|
Execution Of Construction Works Together With The Accompanying Infrastructure And Other Works Resulting From The Design Documentation And The Requirements Of The Obtained Technical Conditions, Arrangements, Opinions, Studies And Administrative Decisions, In Accordance With The Decision To Authorize The Implementation Of A Road Investment For The Project (Zrid) And Obtaining A Permit To Use The Facility On Behalf Of The Ordering Party. The Subject Of The Order Is The Implementation Of A Road Investment Entitled: Construction Of A Municipal Road - Ul. Siarkowa At Km: From 0+000 To 0+463.06 Along With Exits: Ul. Żeglarska From 0+000 To 0+080, Ul. Kajakowa From 0+000 To 0+070, Ul. Wakacyjna From 0+000 To 0+035 In Tarnobrzeg” And Obtaining The Required Decisions Authorizing The Use Of The Road, In Accordance With The Procedure Specified In The Construction Law, In The Scope Of: • Cutting Down Trees And Low Greenery Colliding With The Planned Municipal Road - Siarkowa Street, • Reconstruction Or Protection Of External Devices Colliding With The Planned Investment, • Construction Of A Municipal Road - Siarkowa Street With A 6.0 M Wide Bituminous Road With Concrete Curbs On Both Sides, • Construction Of A Road At Siarkowa Street For Pedestrians And Bicycles With A Bitumen Surface 3.0 M Wide, Framed On Both Sides With A Concrete Edge, • Reconstruction Of The Intersection Of Siarkowa Street With Żeglarska Street, Kajakowa Street And Wakacyjna Street Into A Roundabout, • Reconstruction Of The Intersection Of Siarkowa Street With A. Mickiewicza Street And Orląt Lwowskich Street, • Construction Of Regular Exits To Plots Adjacent To The Street Siarkowa And Kajakowa Streets. At Kajakowa Street And At Siarkowa Street, On The Side Of The Road For Pedestrians And Bicycles, There Are Exits With A Bituminous Surface, On The Opposite Side Of Siarkowa Street, With A Concrete Block Surface, • At Żeglarska Street, Kajakowa Street And Wakacyjna Street, Construction Of A Two-Way Bicycle Road With A Bituminous Surface, 2.5 M Wide, Framed On Both Sides With A Concrete Edge, And Construction Of A 2.0 M Wide Pedestrian Road Made Of Concrete Cubes Framed On Both Sides With A Concrete Edge, • Construction Of Street Lighting, • Construction Of A Service Channel, • Construction Of A Drainage System For The Municipal Road - Siarkowa Street, Corresponding To The Terrain Conditions, Including: • Liquidation Of An Earth Ditch Along Ul. Siarkowa On The Section From Km 0+015 To Km 0+145, • Reconstruction Of The Earth Ditch Along Ul. Siarkowa On The Section From Km 0+145 To Km 0+162 Into A Covered Ditch Made Of Reinforced Concrete Pipes With A Diameter Of 80 Cm, • Reconstruction Of A Culvert With A Diameter Of 80 Cm Under Ul. Sifurkowa Consisting Of Its Extension And Connection With A Covered Ditch, • Construction Of A Storm Sewage System With Inspection Wells And Storm Inlets With Drains Leading To The Existing Storm Sewage System In Żeglarska Street, • Construction Of A Sewage System
|