Landscape Architectural Services – Sp Steigerhubel, Steigerhubelstrasse 55B, Lawns, Bkp 496.5 Landscape Architecture. The Order Includes The Planning Of The Following Two Tasks: In Order To Further Increase Capacity, In Addition To The Renovation Of The Training Field According To Din18035, The Main Field Is To Be Converted From Natural Turf To Artificial Turf. This Is Intended To Increase The Hours Of Use And Make The Space And The Cloakroom Building Accessible To Other Clubs. The Two Sports Fields Are Currently Used Exclusively By Sc Holligen 94. A Suitable Irrigation System Should Be Found For The Use Of Artificial Turf And Natural Turf. The Lighting From 2016 Is In Good Condition. However, The Surrounding Area Should Be Checked For Light Pollution Due To Scattered Light. If Necessary, The Lamps Should Be Replaced Or The Existing Lighting Replaced. The Existing Equipment Such As Ball Catchers And Goals Should, If Possible, Continue To Be Used And Supplemented With Goal Depots 3-In-1 System With Ground-Level Access And A Game Display According To The Usual Standard. If Possible, A Spectator Area Must Be Planned Along The Playing Field, Which Must Be Separated From The Playing Field With A Surrounding Field Barrier. Two-Wheeler Parking And The Logistics Of Passenger Transport On Site Have Already Been Examined As Part Of The Cloakroom Expansion. We Are Not Assuming Any Further Measures. This Must Be Discussed With Traffic Planning.
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120293144
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.