The Scope Of Work Includes: * Demolition Of The Indicated Building Elements, Reconstruction Of The Existing Building, Expansion Of The Building, Strengthening The Structure, Construction Of New Building Partitions, Construction Of New Floors, Plastering Works, Painting Works, Cladding Works, Installation Of Windows And Doors, Construction Of Facades, And Performance Of All Finishing Works. All Materials, Devices And Equipment Elements Used Must Be Brand New, Of Full Value, Free From Defects, Approved For Use In Construction And Have The Legally Required Declarations Of Performance, Certificates And Ce Marking, If Required. * Water Supply Installation, Sanitary Sewage Installation, Central Heating Installation, Domestic Hot Water Installation, Ventilation Installation, Heat Pump Installation. All Installations Should Be Adjusted, Put Into Operation And Subjected To Tightness And Efficiency Tests In Accordance With Applicable Standards And Recommendations Of Device Manufacturers. * Electrical Installation, Basic Lighting, Emergency Lighting, Lightning Protection Installation, Internet Installation, Telecommunications Installation, Necessary Control Systems. The Contractor Is Obliged To Perform All Required Protective Measurements, Measurements Of The Effectiveness Of Anti-Shock Protection, Measurements Of Lighting Intensity And Provide A Complete Set Of Protocols To The Ordering Party. * Delivery And Installation Of A Heat Pump, Delivery And Assembly Of A Photovoltaic Installation Placed Exclusively On The Ground (On Free-Standing Tables In A Hot-Dip Galvanized Steel Structure With Supports Driven Into The Ground, In Accordance With The Pw Of The Electrical Industry). Installation Of Panels On The Roof Of The Building, Making All Necessary Connections, System Configuration, Technological Start-Up, Measurements And Acceptance, The Technical Parameters Of The Heat Pump And Photovoltaic Installation Cannot Be Lower Than Those Specified In The Design Documentation And Documentation Of The Project Co-Financed By The European Funds For Podlaskie 2021-2027 Program. * Land Development: Earthworks, Communication Routes, Restoration Of Green Areas, Plantings, Small Architecture Elements, Other Works Resulting From The Documentation Design. After Completing The Works, The Contractor Is Obliged To Tidy Up The Entire Investment Area And Restore The Adjacent Areas To A Condition No Worse Than Before The Commencement Of The Works. *Equipment: Furniture, Office Equipment, Classroom Equipment, Conference Equipment, Audiovisual Equipment, Interactive Whiteboard, Projector, Projection Screen, Microphones, Sound System, Laptop, Braille Printer Other Equipment Specified In The Documentation. All Equipment Elements Must Be Brand New, Unused, Complete, Have The Required Safety Certificates And Meet The Minimum Technical Parameters Specified In The Design Documentation And Equipment List. After The Investment Is Completed, The Facility Must Meet The Accessibility Requirem
|