The Subject Of The Order Is The Construction Of A Detached, Single-Story Building With No Basement, A Village Community Center In Modular Container Technology (Outer Dimensions 12.00 X 6.00 M) Along With The Necessary Technical Infrastructure And Land Development On The Plot No. 249 Within 0008 Franopol, Sarnaki Commune. The Implementation Of The Task Includes In Particular The Following Material Scope: 1) Preparatory, Measurement (Surveying Services) And Earthworks, Including The Removal Of The Topsoil Layer And Removal Of Excess Excavated Material, As Well As The Foundation Of The Facility (Substructure, Concrete Base, Insulation, Ring Earthing, Culverts, Under-Floor Sewage System And Reinforced Concrete Foundation Slab), 2) Preparation And Agreement With The Designers Of Workshop And Assembly Documentation Before Prefabrication And Delivery, Transport, Unloading, Assembly And Anchoring On The Foundation Slab Of A Complete Building Of A Village Community Center In Modular Container Technology, Together With An Anti-Corrosion And Fire-Protected Steel Structure, Wall And Roof Cladding Made Of Sandwich Panels, Attic, Sheet Metal Work, Gutters, Façade Finishing And External Window And Door Joinery, 3) Comprehensive Finishing And Furnishing Of The Interior Of The Building (Including The Main Hall, Communication, Utility Room, Sanitary Vestibule, Mens Toilet And Womens Toilet Adapted For People With Disabilities),4) Execution Of Complete Internal Installations In The Building: Water Supply Installation With Local Domestic Hot Water Preparation, Sanitary Sewage Installation, Electrical Installation With Switchgear, Accessories, Basic Led Lighting And Emergency Evacuation Lighting, Gravity Ventilation And Mechanical Exhaust Ventilation In Sanitary Facilities, As Well As Heating And Cooling Installations,5) Construction Of A Sanitary Sewage Connection Together With Connection Design Documentation, Trenchless Passage, Wells, Tightness Test And Inspection (Cctv),6) Construction Of A Water Supply Connection (Including Connection Design Documentation, Tightness Test, Flushing And Disinfection) And An External Power Supply Line - Power Connection (Including Connection Design Documentation And Electrical Measurements),7) Construction Of An Internal Communication System And Landscaping Of The Area With Concrete Paving Stones Along With The Substructure And Edges (Including An Access Road, Maneuvering Area, Pedestrian Access, 5 Parking Spaces - Including A Position For People With Disabilities With Signage, Solid Waste Collection Point), As Well As Construction Of An Entrance Platform, External Stairs And A Ramp For People With Disabilities Along With Balustrades/Handrails,8) Carrying Out With A Positive Result All Required Tests, Tests, Measurements And Acceptances, Joint Commissioning Of The Installation, Training The Employers Representative In The Operation Of The Facility And Preparing Complete As-Built Documentation Along With An As-Built Geodetic Invento
|