The Scope Of The Task Includes: 1) Preparatory Works: Measurement Works Together With The Preparation Of An Inventory, Removal Of A Layer Of Fertile Soil Up To 15 Cm Thick Using Bulldozers On The Roadsides Along The Road With Transport To A Storage Area Up To 2 Km Away For Pedestrian Routes. Renovation Works - Milling Of Bituminous Surface With A Thickness Of Up To 4 Cm With Removal Of Demolition Material At A Distance Of Up To 1 Km, Dismantling Concrete Curbs 15X30 Cm On A Sand Ballast, Dismantling Footings For Concrete Curbs, Dismantling The Surface Made Of Concrete Cubes On A Cement-Sand Ballast With Cement Mortar Joints, Height Adjustment, Cleaning And Unblocking Manholes And Inlets.2) Surfaces Roadway: Substructure Made Of Crushed Aggregate - Lower Layer After Compaction. Up To 15 Cm Reduction Per Restoration. Manual Construction Of A Trough Across The Entire Width Of The Road And Sidewalks In Soil Of Categories Iii-Iv, Deep. 20 Cm. Concrete Curb Footing With Support. Protruding Concrete Curbs With Dimensions 15X30 Cm On A Cement-Sand Bed. Sprinkling Asphalt On Unimproved Road Surfaces. Surface Made Of Mineral-Bituminous Grit-Gravel Mixtures Ac 11S - Thick Asphalt Wearing Course After Compaction. 2 Cm. Surfaces Made Of Ac16w Asphalt Mineral-Bituminous Mixtures, 3 Cm Thick (Binding Layer)3) Pedestrian Path Surface: Manual Construction Of A Trough Over The Entire Width Of The Road And Sidewalks In Soil Of Categories Iii-Iv, Deep. 20 Cm. Substructure Made Of Crushed Aggregate - Bottom Layer With A Thickness Of Approx. 15 Cm. Substructure Made Of Natural Aggregate - Upper Layer With A Thickness Of Approx. 8 Cm. Concrete Curb Footing With Support. Concrete Edging Dimensions. 30X8 Cm On A Sand Bed With Cement Mortar On The Joints. Surfaces Made Of Concrete Paving Stones, Thickness. 8 Cm On Cement-Sand Ballast4) Finishing Worksmanual Painting Of Pedestrian Crossings, Segregation Lines And Continuous Edge Lines On The Road.Manual Planing Of The Surface Of Native Soil, Category I And Iii - Estimate. Removal And Disposal Of Demolition Materials. Topsoiling With Sowing With A Topsoil Layer Of 5 Cm Thick. Measurements And Inventories
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120251924
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.