The Subject Of The Order Is The Preparation Of Design And Cost Estimate Documentation For The Reconstruction Of The Municipal Road Ul. Wielokowa In Bytów. The Scope Of The Task Includes Preparation Of Design And Cost Estimate Documentation For The Reconstruction Of The Municipal Road Ul. Horizontal In Bytów, Approximately 450 M Long (Illustrative Route In Accordance With Annex No. 4 To The Swz) Along With Obtaining A Building Permit Or A Decision Authorizing The Implementation Of A Road Investment. The Documentation Should Be Prepared In The Following Scope: Road Industry: - Pedestrian And Road Route With A Width Of 5 M To 5.5 M, - One-Way Road In Sections, - Construction Of A U-Turn, - Construction Of Stairs Connecting The Street. Wierzkowa From Ul. Mierosławskiego, - Double-Sided Roadsides, - Technological Channel. Sanitary Industry: - Drainage Ensuring The Collection Of Water From Pedestrian And Road Routes (E.G. Construction Of A Rainwater Drainage System With Utilities). Electrical Industry: - Construction Of Road Lighting With The Possibility Of Using Smart City Technology. As Part Of This Order, You Must Prepare Materials For Obtaining A Building Permit Or A Decision In Accordance With The Act Of April 10, 2003 On Special Rules For The Preparation And Implementation Of Investments In The Field Of Public Roads In Order To Obtain Land For A Road, Including: 1) Multi-Discipline Construction Project: • Maps For Design Purposes, • Land Development Design, • Road Industry Design, • Traffic Organization Design, • Sanitary Industry Design, • Electrical Industry Design, • Technical Designs, • List Of Plots Necessary For The Implementation Of The Investment, • Division Designs, • Traffic Organization Design - Vertical And Horizontal Markings After Construction Completion. 2) Technical Specifications And Bills Of Quantities. 3) Investors Cost Estimate And Summary Of Costs. 4) Electronic Versions Of The Entire Subject Of The Order. In Addition, The Contractors Obligations Include Obtaining On Behalf Of The Ordering Party: - A Decision On Environmental Conditions, Consent To The Implementation Of The Investment (If Required), - Water And Legal Permits (If Required), - Obtaining All Necessary Arrangements To Obtain A Building Permit Or A Decision Authorizing The Implementation Of A Road Investment, - Obtaining A Building Permit Or A Decision Authorizing The Implementation Of A Road Investment. The Study Should Be Prepared In The Following Quantities: 1) Paper Version In 4 Copies, 2) Electronic, Non-Editable Version Of The Project Approved By The Zrid Decision Or The Decision Of The Construction Permit On A Cd/Dvd For Making The Tender Documentation Available On The Website - 1 Set.3) Electronic, Editable Version Of The Project Approved By The Zrid Decision Or The Decision Construction Permits On Cd/Dvd - 1 Set.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120251864
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.