Architectural, Engineering And Planning Services – Jg | U New Replacement Greenhouses - General Planning Assignment. The Greenhouses Of The Botanical Garden Are Located On The Campus Of The Johannes Gutenberg University In Mainz. The Area Covers Approximately 11,950 M². The Subject Of The Measure Is The Partial Dismantling Of The Existing Greenhouse Facilities, Including Existing Pipes, As Well As The Construction Of New Replacement Buildings With Associated Outdoor Facilities. The Implementation Will Take Place In Four Partially Overlapping Construction Phases While Planting, Research And Gardening Operations Are Ongoing. The Individual Areas Will Be Gradually Put Into Operation After Completion. This Results In Special Requirements For Interdisciplinary Coordination, Scheduling And Construction Scheduling, Interim And Temporary Measures As Well As Construction Site Logistics. The New Greenhouse Facility Covers Approximately 2,360 M² And Is Divided Into Publicly Accessible Display Greenhouses And Non-Public Areas For Research, Cultivation And Collection. Construction Phase 1: Dismantling Of Six Greenhouses Including Pipes; New Construction Of A Tropical House, A Connecting Building With A Technical Basement And A Greenhouse For Secondary Forest And Tropical Crops. Construction Phase 2: Dismantling Of Eleven Greenhouses, Cold Frames And Connecting Construction; New Construction Of A Connecting Building With Technical Areas, A Greenhouse For Outdoor Cultivation, Two Research Houses And Three Greenhouses For Cultivation And Collection Including Cold Frames. Construction Phase 3: Dismantling Of A Tropical House With A Technical Center And Film Greenhouses; New Construction Of A Winter Shelter. Construction Phase 4: Dismantling Another Greenhouse And Final Construction Of The Outdoor Facilities Including Replanting Of The Remaining Plants. The Basis Of The Planning Is The Present Feasibility Study Including The Spatial Map. Expected Dates - Creation And Finalization Of The Hu Construction Documents: 07/2027 To 11/2027 - Examination Of The Hu Construction: 11/2027 To 06/2028 - Approval/Approval: 07/2028 - Awarding Of Construction Services: 01/2029 To 05/2029 - Construction Site Setup: 10/2029 To 12/2029 - Version Ba 1: 12/2029 To 10/2030 - Version Ba 2: 07/2030 To 07/2031 - Version Ba 3: 07/2031 To 06/2032 - Version Ba 4: 05/2032 To 05/2033 - Complete Commissioning And Adjustment: 03/2033 To 07/2033 - Final Acceptance And Project Handover: Until 09/2033 The Client Will Specifically Commission Or Provide Building Ground/Geotechnics, Surveying, Sigeko Including Engineer For Contaminated Areas, Test Statics, Higher-Level Fire Protection Advice/Testing, Sewer/Line And Divisional Investigations As Well As Explosive Ordnance Investigations. The Remaining Required Property And Specialist Planning Services Are Provided And Coordinated By The General Planning Team. This Includes, In Particular, Property Planning, Structural Planning, Technical Equipment, Open-Air Facility Planning, Project-Related Fire Protection, Thermal Building Physics/Heat Protection/Energy Balancing, Bnb/Sustainability S
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120238880
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.