Landscaping Work – Landschaftsbauarbeiten. The Main Services To Be Provided Are: 01 Landscaping Work On The Ground Floor - 600 M Demolition Of Tree Protection Fence - 750 Sq M Of Bizuminous Covering, Demolish, Dispose Of - 300 Sq M Of Concrete Paving, Demolish, Dispose Of - 20 Sq M Of Holm Terrace, Demolish, Dispose Of - 2,500 Sq M Of Ground Cover Cleared - 500 Sq M Of Terrain Cleared - 15 Pieces Of Maintenance Cuts For Existing Trees - Loosen 2,590 M² Of Soil - Expand 500 M² Of Topsoil - Loosen 8,115 M² Of Subsoil - Deliver And Install 2,590 M² Of Soil - Profile 12,950 M² Of Soil - Model 1,400 M² Of Terrain - Create 57 Tree Pits - Expand 175 M² Of Sludge Pond - Reinstall 500 M² Of Soil - Plan 1,500 M² Of Piles - Load 2,600 M² Of Separation Materials - Dispose Of 4,600 T Of Soil - Dispose Of 80 M² Of Building Rubble - Dispose Of 1,650 M² Of Bitumen Mixture - Dispose Of 150 M² Of Concrete Waste - Level And Compact 4,290 M² Of Building Soil - Provide 1,365 M² Of Frost Protection Layer, Install - Deliver 700 M² Of Geotextile, Install - Deliver And Install 2,210 M² Of Sliding Layer And Fleece - Deliver And Install 675 M² Of Dimpled Membrane - Produce 430 M² Of Foam Glass Gravel - Install 2,140 M² Of Filter Fleece - Deliver And Install 528 M Of Concrete Edging - Provide And Install 165 M Of Granite Curbstone - Supply And Install 40 M Of Angle Steel - Manufacture 235 M Concrete Wedge - 2,960 M² Asphalt Base Layer/Top Layer, Deliver, Produce - 2,475 M² Asphalt Grinding - 95 M² Manufacture Tactile Guidance System - 1,995 M² Concrete Block Pavement, Deliver, Produce - 145 M One-Liner - 760 M² Lawn Slab, Deliver, Produce - 300 M² Fall Protection Surface Made From Wood Chips, Deliver, Produce - 75 M² Deliver And Manufacture Fall Protection Covering Made Of Epdm - Create 75 M² Of Drainage Concrete Layer - Apply 422 M Of Hot Plastic Compound - Deliver And Install 105 M Of Facade Gutter - Deliver And Install 147 M Of Drainage Gutter - Deliver And Install 45 M Branch Canal - Create 370 M Of Cable Trenches - Deliver And Install 760 M Of Cable Protection Pipe - 35 Pcs. Manufacture Bucket Foundations - 319 Pcs. Deliver And Install Bricks From Nagelfluh - 15 Pcs. Deliver And Install Bench Supports - 77 Pcs. Deliver And Install Prefabricated Concrete Parts - 70 M Of Steel Upstand, Deliver And Install Raised Beds - 46 M Of Robinia Bench Support, Deliver And Install - 49 M Of Deep Curbs As Supports, Deliver And Manufacture - 277 Pcs. Deliver And Install Prefabricated Concrete Parts - 20 Pcs. Deliver And Manufacture Scraper Frosts - 6,460 Pcs. Shortening Of Existing Steel Bars - 56 M Handrail, Delivery, Manufacture - 179 Pcs. Bicycle Stands, Delivery, Manufacture - 28 Pcs. Scooter Parkers, Delivery, Installation - 8 Pcs. Waste Paper Baskets, Delivery, Installation - 15 Pcs. Bench-Table Combination, Delivery, Installation - 4 Pcs. Parasol Sleeves, Delivery, Installation - 4 Pcs. Flagpoles, Delivery, Installation - 18 Pcs. Deliver And Install Play/Sports Equipment - Deliver And Install 1,145 Tree Pit Substrate A/B - Produce 6,485 Sqm Of Fine Planum Topsoil - Supply And Install 710 Cbm Of Topsoil - 5,690 Sqm Of Vegetation Base Layer Produce A Species-Rich Meadow - Supply And Install 795 Sqm Of Mulch - Supply 160 Sqm Of Drainage And Water Storage Element, Ei
|