The Scope Of The Investment Includes Hardening The Street Surface With Yomb Boards. Firefighter In Łebno On A Section With A Total Length Of Approximately 520.00 M And A Width Of 4.0 M + Shoulders 2 X 0.5 M, In Accordance With The Technical Specification And Bill Of Quantities. Scope Of Work: • Surface Area Of Slabs With Exits - 520 M X 4 = 2080 M2 • Number Of Slabs: 2,774 Pcs. (Supplied By The Ordering Party) • Length: 520 M, Width: 4 M + Roadsides 2 X 0.5 M• Carrying Out Geodetic Measurements - Reconstruction Of The Route And Height Points,• Cleaning Of The Roadsides And Restoring Roadside Ditches,• Renovation Of The Road Culvert With The Foundation - Corrugated Pipe Fi 600, 8 M Long, Along With Strengthening The Abutments;• Execution Of Earthworks, In Particular Trenching Along With Profiling And Compacting The Subsoil,• Foundations And Surface Works - Gravel And Sand Subbase With A Thickness Of 12 Cm After Compaction, • Development Of Roadsides, • Stone Material Obtained During The Preparation Of The River Bed Should Be Used To Strengthen The Existing Soil In The Widening Places, Where The Designated Road Trace Deviates From The Existing Hardening, • Removal Of Possible Bushes And Rootwood In The Road, • Development Of A Temporary Traffic Organization Project And Its Implementation, 3.The Contractor Is Obliged To Perform Post-Construction Geodetic Measurement Of The Task; Documentation Stamped With Appropriate Seals Confirming Positive Control By The District Office Should Be Submitted In Writing - 3 Copies And Electronically In (Pdf Or Jpg And A File Opened By The Cartographic Program Mmp Or Dxf). 4. In All Provisions Of The Swz And Its Annexes In Which The Ordering Party, Due To The Inability To Describe The Subject Of The Contract In A Sufficiently Precise And Understandable Way, Refers To Standards, Technical Assessments, Technical Specifications Or Reference Systems Technical Information, Or Trademarks, Patents, Sources Of Origin Or Specific Processes That Characterize The Products Or Services Provided By A Specific Contractor Are Indicated, In Accordance With Article 99(5) Of The Public Procurement Law, The Ordering Party Allows Solutions Equivalent To Those Described The Contractor Is Obliged To Deliver The Mentioned Products. This Information Is Included Only To Present The Assumptions And Expectations Of The Ordering Party. These References Are Intended To Indicate The Technical Level Or Functional Point Of Reference For Specific Manufactured Products To Maintain The Expected Level Of The Product Standard, E.G. Those Selected For Installation. These Products Are Not Obligatory For Use, And The Selected Contractor Has The Right To Propose Equivalent Solutions Provided That The Parameters Specified In The Order Documents Are Met The Solution Meets The Requirements Specified By The Ordering Party. In Such A Case, The Contractor Attaches A List Of Equivalent Solutions To The Offer. 5. The Ordering Party, Using The Names Of The Standards
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120204344
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.