Lift Installation Work – General Renovation Of Theater Vorpommern - Greifswald Venue / Repair And Expansion. - Installation Of A 630 Kg Passenger Elevator In A Barrier-Free Version, Elevator System In Cable Design - Machine In The Shaft Head - Doors On The Floors On One Side (Two-Part Sliding Door According To En81 Made Of Stainless Steel) - Doors Opening On One Side On The Right - Control Panel In A Handicapped-Accessible Version With Tactile Labeling - Passive Fire Control - Preferential Control Using A Key Switch - 4 Stops On One Side (3 X Side 1 And 1 X Side 2) - Conveying Height 8,680 Mm, Conveyor Speed 1.0 M/S - Cabin Protective Equipment Reusable For Further Transports With Transparent Pvc Windows For Use Control Panel - Shaft Smoke Extraction (Central Unit With Smoke Suction Device To Control A 24 V Louvre Flap With Powerless Reset, Certified According To Din En 12101-2 For Roof And Wall Installation) - User Instructions And 4 Copies Of The Inspection Documents In Paper And On Data Carrier Stick) - Expert Acceptance By A Recognized Expert - Installation Of A Barrier-Free, Machine Room-Free Freight Elevator 3,200 Kg In A Newly Manufactured Shaft Made Of In-Situ Concrete, Elevator System In Cable Design - Gearless, Frequency-Controlled Three-Phase Drive, Adjustable Computer-Controlled Travel Curve Setting - Shaft With Guide Rails And Unnoticeable Travel Over Rail Joints - Cabin Doors: Opening On Both Sides, Four-Leaf Sliding Door According To En 81 For Maximum Conveying Capacity And Driving Comfort, Made Of Stainless Steel, Doors Opening On One Side To The Right - Shaft Doors: Four-Leaf Sliding Door Opening On Both Sides According To Din 18091 With Building Regulations. Approval For Fire-Resistant Shafts According To Din 4102, Material V2a - Shaft Equipment With Mobile Ladder Made Of Aluminum Approx. 3 M Long - Shaft Smoke Extraction (Central Unit With Smoke Suction Device In Conjunction With An Emergency Power-Supplied Smoke Extraction Center - Elevator Shaft - Ventilation Slat With Fixing Tabs And Motor Drive For Installation In The Elevator Shaft Ceiling - Dynamic Fire Control - 4 Stops [1 X One-Sided (1St Floor), 3Rd Floor X Through-Loader (Kg, Ec, 2Nd Floor)] - Key Switch In The Cabin Control Panel To Trigger A Special Trip - Conveying Height 9,660 Mm, Conveying Speed 1.0 M/S - Cabin Protective Equipment Reusable For Further Transports With Transparent Pvc Windows For Use Control Panel - Shaft Smoke Extraction (Central Unit With Smoke Suction Device To Control A 24 V Louvre Flap With Currentless Reset, Certified According To Din En 12101-2 For Roof And Wall Installation) In Conjunction With A Smoke Exhaust Control Unit Supplied With Emergency Power - User Instruction And 4 Copies Of The Inspection Documents In Paper And On A Data Storage Stick) - Expert Acceptance By A Recognized Expert - Submission Of A Maintenance Contract For Both Elevators (Requirements Item) - Submission Of An Offer For Answering Emergency Calls For Both Elevators (Requirements Item)
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120196990
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.