|
Supply Of s & i of body shell items & partition frames (km dtc rvnl) , supply and installation body shell items & partition frames for km/dtc/rvn l coaches as per drg nos, 1. 98210029, alt b - 1 no 2. 98210028, alt b - 1 no 3. 98210027, alt ni l - 2 nos 4. 99410146, alt a - 1 no 5. 99410145, alt a - 1 no 6. 99410144, alt nil - 1 no 7. 9941014 3, alt nil - 1 no 8. 99410142, alt nil - 1 no 9. 99410141, alt nil - 1 no 10.99410140, alt a - 1 no 1 1.99410006, alt a - 1 no 12.99510008, alt b - 2 nos 13.99510007, alt b - 2 nos 14.99510004, alt b - 6 nos 15.99510003, alt b - 6 no 16.99410003, alt nil - 1 no, 17.99410005, alt a - 1 no 18.98210 006, alt d - 1 no 19.98210007, alt c - 1 no, 20.98210047, alt b - 2 nos, 21.99410001, item-14, alt nil - 8 nos 22.99410001, item-15, alt nil - 8 nos. the firm shall fulfil the manufacturing faci lity as per icf/md/spec-313, issue status-01,rev.01. special condition : installation required annexure a dated 13.09.2023 to be followed 1. the frame work and weld parts shall be packe d in the container/steel palletas per icf/j&t/sk-1865-alt b. 2. the weld parts shall be placed at the bo ttom and frame work at the top. 3. other partition frames not fitting in the container shall be stacked one over the other, secured using packing strip and placed in steel pallet. 4. packing and placing of th e items to be such that the frames could be removed easily from the packing prior to weld parts witho ut any damages. 5. the height of each stack shall not exceed 750mm for easy handling. 6. suitable a nd sufficient packing strips to be used such that stacked items do not disintegrate during transit, stor age and handling. there will be minor changes in the drawings. the supplier shall obtain the latest drawings before commencing manufacturing. [safety item] [ warranty period : 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ]
|