Mechanized Field Planning, Soil Group: 2, Compaction Of The Soil In The First Pass On One Track With An 8 T Punch Trailer Roller, Layer Thickness: 20 Cm, During Each Subsequent Trip On A Trail, You Must Add To The Norm 01-02-002-03 (4 Additional Trips), Construction Of Paving And Leveling Layers Of Foundations: Sand-Gravel Mixture, Coarse Sand, Sand-Gravel Mixture Or Crushed Stone-Sand Mixture With Optimal Granulometric Composition, Spillage Of Adhesive Materials, Construction Of A Cover With A Thickness Of 4 Cm From A Hot Asphalt-Concrete Mixture Of The Abv Type, Density Of Stone Materials: 2.5-2.9 T/M3, If The Thickness Of The Coating Changes By 0.5 Cm, Add Or Subtract From The Norm 27-06-020-1 (Additional 1 Cm)
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120165571
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.