Tenders Are Invited For Projects For The Construction Of Sidewalks In The Towns Of Liszki, Piekary, Cholerzy ... in Poland
Tender Notice
TenderID
120161774
Tender Brief
Tenders Are Invited For Projects For The Construction Of Sidewalks In The Towns Of Liszki, Piekary, Cholerzyn And A Drainage Project For A District Road In Piekary
Design Of The Construction Of A Sidewalk And Road In Piekary On The Dp2180k Road From Plot 1099/2 To Plot No. 644/4. The Scope Of Work For Part 1 Includes The Development Of Complete Design Documentation For The Task Titled Project Of Construction Of A Sidewalk And Road In Piekary On The Road Dp2180k From Plot No. 1099/2 To Plot No. 644/4. The Material Scope Includes: A.Preparation Of Design Documentation For The Reconstruction/Expansion Of District Road No. 2180K In The Town Of Piekary From Plot No. 1099/2 To Plot No. 644/4 - Section Of Approx. 120 M, In The Scope Of Reconstruction/Expansion Of The Road With The Necessary Widening, Adaptation Of The Surface For A Vehicle Axle Load Of 115 Kn, Construction Of A Sidewalk With The Necessary Pedestrian Crossings, Construction Of Drainage Infrastructure, Protection Of Technical Infrastructure Devices Colliding With Investment. The Scope Of The Task Will Be Finally Confirmed After Selecting The Concept And Carrying Out A Field Visit. B.Design Documentation, Including The Concept, Should Be Prepared On A Current Map For Design Purposes (Mdcp) At A Scale Of 1:500, Which Is To Be Provided With An Official Clause Specified In The Provisions Of Geodetic And Cartographic Law, Which Confirms The Acceptance Of Materials Or Data Sets On The Basis Of Which These Maps Were Prepared And Accepted Into The State Geodetic And Cartographic Resource, Or A Declaration By The Contractor Of Geodetic Works On Obtaining A Positive Verification Result. (Article 34B Of The Construction Law Of July 7, 1994, Journal Of Laws 2024, Item 725, As Amended). The Basis For The Adopted Solutions Should Include, Among Others: Checking Capacity, Analyzing Passability, Ensuring Visibility, Traffic Safety And Analyzing Possible Collisions With The Existing Technical Infrastructure. C. It Is The Contractors Responsibility To Prepare Studies And Design Materials Divided Into Stages: - Stage I - Preparation Of A Current Map For Design Purposes (Hereinafter Referred To As: Mdcp) With An Official Clause Specified In The Provisions Of Geodetic And Cartographic Law, Confirming The Acceptance Of Materials Or Data Sets, On The Basis Of Which These Maps Were Prepared, Into The State Geodetic And Cartographic Resource Or A Declaration Of The Contractor Of Geodetic Works On Obtaining A Positive Verification Result. Preparation Of A Complete Geotechnical Opinion As Well As Research And Forecast Of Traffic Intensity, - Stage Ii - Development Of A Concept, I.E. A Preliminary Design On A Current Map For Design Purposes With The Possibility Of Multi-Variant Real Solutions. Estimation Of Investment Costs For Each Of The Concept Variants And Obtaining The Opinion Of The Commune And Zdpk. - Stage Iii - Development Of A Plot Or Area Development Project, Architectural And Construction/Execution Design For The Scope Whose Implementation Requires Obtaining A Decision On The Permit For The Implementation Of A Road Investment (Zrid) And/Or A Building Permit Decisio
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120161774
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.