Underground Work Other Than Tunnels, Shafts And Subways – Civil Engineering Services Final Expansion Of Outdoor Facilities - Gnue Lsbb Saxony-Anhalt Restructuring Of The Mixing Department New Construction Of The Bernburg Road Maintenance Department With Road Maintenance Department (Sm) With 3Rd Bridge Inspection Team (Wlb-2026-0440). Among Other Things: Loosening 2500 M³ Of Soil 2150 M² Dismantling Construction Road By Milling 3400 M³ Delivering Building Materials 10115 M² Producing Subgrade 10115 M² Compacting Soil 500 M Lwl Outdoor Cable Delivering And Laying Multi-Mode Fiber Including All Ancillary Services Covering 1250 M³ Of Topsoil Of The Ag 4000 M² Of Vegetation Area Manufacture 1,440 Pieces Of Woody Plants, Deliver And Plant, Including 2 Years Of Development Care, Produce 4,000 M² Of Lawn Seeding With Rsm, Deliver And Install 420 M Of Lattice Mesh Fence H = 2.03 M, Deliver And Install 1 Piece Of Self-Supporting Sliding Gate, 10 M Wide, Including All Ancillary Services, Deliver And Install 1 Piece Of Self-Supporting Sliding Gate, 9 M Wide, Including All Ancillary Services, Supply And Install 1 Piece Of Barrier System, 10 M Wide, Incl. All Ancillary Services 1 Barrier System 9 M Deliver And Install Including All Ancillary Services 81 M Filler Bar Railing H = 1.10 M Deliver And Install 2500 M³ Loosen Soil 2150 M² Dismantling Construction Road By Milling 3400 M³ Deliver Building Materials 10115 M² Produce Subgrade 10115 M² Compact Soil 2640 M³ Frost Protection Layer Deliver, Install And Compact 9200 M² Of Gravel Base Course, Deliver, Install And Compact 1100 M² Of Concrete Curbs Of All Formats, Deliver And Install 960 M² Of Concrete Paving, Deliver, Lay And Adjust 8100 M² Asphalt Base Course, Deliver And Install 7600 M² Asphalt Binder, Deliver And Install 8100 M² Asphalt Surface Layer, Deliver And Install 116 Pieces Of Angle Support Elements H=2.10 M, Deliver And Install 32 Concrete Block Steps L = 1.00 Deliver And Install 270 M Pipe Trench For Sw And Rw, Including Backfilling 252 M Plastic Pipe Dn 150 Pp Deliver And Lay 88 M Box Gutter Dn 150 D400 Deliver And Install 18 M Box Gutter Dn 150 C250 Deliver And Install 60 M Pipe Pe 100 Tw Ad/Wd 90/8.2Mm Deliver And Lay 250 M Pipe Pe 100 Tw Ad/Wd 75/4.5Mm Deliver And Lay 312 M Kmr Pipe Dn 40 Ds1 Deliver And Lay, Including All Required Fittings 84 M Kmr Pipe Dn 50 Ds1 Deliver And Lay, Including All Required Fittings Make 435 M Cable Trenches, Including Backfilling 65 M³ Excavation Pit For Manufacture Cable Pull Shafts, Including Backfilling 14 Pieces Of Sleeve Foundations For Street Lighting Poles Deliver And Install 500 M Fiber Optic Outdoor Cables Supply And Lay Multi-Mode Fiber Including All Ancillary Services Cover 1250 M³ Of Topsoil Of The Ag 4000 M² Of Vegetation Area 1440 Pieces Of Woody Plants Deliver And Plant, Including 2 Years Of Development Care 4000 M² Of Lawn Seeding With Rsm Manufacture 420 M Mesh Fence H = 2.03 M, Deliver And Install 1 Piece Of Self-Supporting Sliding Gate, 10 M Wide, Deliver And Install Including All Ancillary Services, 1 Piece Of Self-Supporting Sliding Gate, 9 M Wide, Deliver And Install, Including All Ancillary Services, 1 Piece Of Barrier System, 10 M, Deliver And Install, Including All Ancillary Services, 1 Piece Of Barrier System, 9 M, Deliver And Install, Including All Ancillary Services, Deliver And Assemble 2 Maintenance Contracts With Systems Must Be Completed And Submitted With The Offer.
|