|
Landscaping Work For Parks - Execution Of Works On The Investment Objective Development Of The Central Area Within The Project Promotion Of The Cultural And Historical Heritage Of Barlad Municipality. The Project Involves The Redevelopment Of The Central Area Of The Municipality By Modernizing The Victoriei Square, Which Will Include Urban Furniture, Public Lighting, Vegetation, Pavements, Architectural Installations, Bicycle Paths. This Pedestrian Zone Also Extends Towards Stefan Cel Mare Street, Which Will Be Transformed Into A Pedestrian Zone, Completing The Project For The Development Of Public Spaces Through Urban Regeneration. Also, With The Reconfiguration Of Stefan Cel Mare Street, A Reconfiguration Of The Neighboring Streets Is Also Needed, As Well As The Reduction Of The Number Of Parking Spaces In The Area Of Interest. Through This Project, A Modern Central Pedestrian Area With An Area Of Approximately 15,000 Square Meters Is Desired. On Stefan Cel Mare Street, As Well As In Piata Victoriei, It Is Proposed To Develop The Area By: Creating Green Spaces, Equipped With Modern Urban Furniture, Planting Lines Of Trees, Squares, Irrigation System, Etc. These Green Spaces Will Also Have A Filter Role, Like Curtains Of Vegetation In Front Of The Collective Housing Buildings. The Reconfiguration Of The Existing Parking Lots By Reducing Their Number, Delimited Spaces For Various Socio-Cultural Activities, For The Creation Of Public Forum Monuments, To Support The Recreation Of All Age Categories, Spaces For The Organization Of Outdoor Exhibitions, Relaxation Spaces, Artesian Fountains, Water Falls, Water Glitter Will Be Considered. There Will Also Be Playgrounds For Children, The Reconfiguration Of The Parking Spaces Related To The Riverside As Well As The Access Roads To The Shops In The Area, The Arrangement Of A Bicycle Path, The Provision Of Pedestrian Lighting, The Installation Of A Modern Surveillance System For The Safety Of Citizens, Etc. Following The Works According To This Project, The Development Of A Total Area Of Land Of Approx. 16,392.00 Sq M Which Will Include Areas With The Following Destinations: - Pedestrian Walkway Area = 8473.25 Sq M - Playground (Rubber Tiles Surface) = 432.45 Sq M - Green Area (Lawn, Tree Plantings, Planters) = 3247.30 Sq M - Water Surface/Artesian Fountains/Waterfalls = 393.60 Sq M - Proposed Bike Path Area = 762.60 Sq M - Pavement Surface Parking Area = 271.15 Sq M - Proposed Road Surface = 1318.85 Sq M - Proposed Car Parks = 445.55 Sq M - Other Built Elements (Ramps, Stair Steps, Retaining Walls, Etc.) = 1,047.25 Sq M Within The Contract, The Contractor Will Ensure The Execution Of All Works, As As Described In The Technical Project Documents, Annexed To The Present Specification In Compliance With All The Legal Provisions In Force Applicable To The Field Of Works. The Object Of The Contract Resulting From This Procedure Is The Execution Of All The Works Identified In The Specification Documents And Related Annexes And Includes (The List Below Is Not Exhaustive): I. The Provision Of All Necessary Materials And Products, All Machinery, Tools, Means And Equipment
|