Drain-Laying Work – Sanitary Sewage Systems. The Tendered Work Includes Plumbing Work. The Hall 2 Building Will Receive A New Sanitary Installation. Starting From The Drinking Water Center, The Cold Water Supply Is Led To The Consumers Via Stainless Steel Pipes And Heated There Using Decentralized Instantaneous Water Heaters. The Lines Are Looped Through The Sanitary Objects. The Last Extraction Point To Be Connected Is A Heavily Frequented Object, Such As A Toilet Or Washbasin. Dirty Water Is Disposed Of In The Hall Via Three Separate Networks. A Domestic Wastewater Network, An Oily Wastewater Network And A Greasy Wastewater Network. After The Oily And Greasy Wastewater Has Been Treated Using Appropriate Separation Technology, The Networks Are Brought Together And Connected To The External Waste Water Network On Street 6. The Rainwater Is Drained Away Via Internal And External Pipes And Used To Flush The Toilets And Urinals. The Distribution Is Connected To The Sanitary Facilities Via Its Own Network And Has A Make-Up With Free Outlet From The Drinking Water Network
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120063131
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.