Track Construction Works – 27Ffp28_Obp_Haiger-Wetzlar. Construction Phase 1: 11,882 M Of Rail Renewal, 7,162 M Of Track Renewal, Of Which 6,368 M Using The Assembly Line Method Including Bed Cleaning (40% Vbe - 100% Vbe) And 794 M Using The Conventional Construction Method Including Vbe, 3,097 M Of Installation Of Subgrade Protection Layer, Of Which 2,803 M Of Mechanical Installation And 294 M Of Conventional Construction. Installation, 1,996 M Of Te Renewal Including Documentation, 340 M Of New Construction Of An Infiltration System With Half Shell And Cable Duct, 929 M Of New Construction Of Cable Duct, Maintenance Work: 600 M Of Te Flushing, 75 M Of Sleeper Replacement, Renewal Of Railway Crossing Surfaces In 2 Level Crossings, Welding Work, Tamping And Straightening Work, Logistics, Construction Site Equipment, Preparatory Work, Rework, Shunting Path Work, Quality Pot Passage, Safety Services, Construction-Related Services Construction Phase 2: 1X We Ibw 60-300-1:9 With Installation Pss And Te, 1 X We Abw 60-500-1:12 With And Te Installation Pss, 1X Ibw 60-500-1:12 With Installation Pss, 1X Ibw 60-760-1:14 With Installation Pss, 1X Abw 60-760-1:14 With Installation Pss, 1X Ew 54-190-1:9; 1239M Rail Renewal, Welding Work, Tamping And Straightening Work, Logistics, Construction Site Setup, Preparatory Work, Rework, Shunting Path Work, Quality Potting, Safety Services, Construction-Related Services
|