|
The Subject Of The Order Is The Construction Of A Sports Facilities Building In The Wojkowice Sports Park Along With A Full-Size Training Pitch. The Task Was Carried Out In The Design And Build Formula. The Scope Of Work To Be Carried Out As Part Of The Investment Was Divided Into Two Zones: Zone A - Sports Facilities: 1) Demolition Of The Existing Sports Facility And Guardhouse (Basement, Ground Floor, First Floor) 2) Construction Of A New Sports Facility (Ground Floor, First Floor) 3) Construction Of A New One With Reconstruction Of The Existing Technical Infrastructure (External Sanitary, Electrical And Low-Voltage Installations) 4) Construction Of Road Infrastructure And Greenery, Including: Square, Sidewalks, Greeneryzone A Intended For The Location Of A Two-Story Facilitya) Ground Floor Intended For The Following Functions: Entrance Hall With Lobby And Reception, Office Room, Staircase, Lecture Hall For Approx. 30 People, Technical Rooms, Trainers Rooms, Judges Rooms, Administration Room, Communication, Vestibule, Toilets, Home Teams Locker Room, Guests Locker Room, Juniors Locker Room 1, Juniors Locker Room 2, Warehouse, Public Toilets (Rainwater And Electrical Installations, Drainage, Rainwater Tanks, Connection To A Watercourse)3) Construction Of Technical Infrastructure Related To The Pitch Equipment (Demolition Of The Existing Fence, Construction Of A New Fence, Construction Of Sports Stands, Construction Of Ball Catchers) In Zone B, It Is Planned To Locate A Football Training Pitch With An Artificial Grass Surface Along With Technical Infrastructure In The Form Of Pitch Drainage And Stormwater Drainage. Additionally, It Is Planned To Dismantle The Existing Fence On The North Side And Build A New Fence, Build 6-Meter-High Ball Catches With Goals And Sports Stands. Investment Location For The Construction Of A Sports Facility (Zone A): Plot No. 1550/11, 1550/13, 1550/29, 1551/1, 1551/6. Investment Location For The Construction Of A Sports Field (Zone B): Plot No. 1551/4, 1555/1, 1555/2. The Scope Of Works As Part Of The Investment Includes In Particular: - Demolition Of The Existing Building Along With The Performance Of All Formal And Legal Activities Necessary To Carry Out The Demolition, Including Obtaining The Required Arrangements, Opinions, Permits Or Notifications, In Accordance With Applicable Legal Regulations, - Preparation Of A Construction Design And Obtaining For It The Following Regulations: Opinions, Arrangements And Permits Together With A Building Permit, - Preparation Of Technical Designs, - Surveying Services, - Performance Of Construction And Assembly Works Based On The Above Designs, - Delivery Of Devices And Installations Along With Movable Equipment (Furniture, Chairs, Desks, Etc.) And Ict Equipment In The Form Of A Projector With A Screen, - Delivery Of A Set Of Parts Used During Operation And Technological And Laboratory Consumables Necessary For Use Until The End Of The Defect Reporting Period For A
|