4.1 The Subject Of The Order Is The Completion Of Works As Part Of The Task Of Expanding The Sewage Treatment Plant In Puchaczów.4.2 The Scope Of The Order Includes The Performance Of Construction Works, In Particular: 4.2.1 The Subject Of The Investment Is The Completion Of Construction Works Consisting In The Expansion Of The Sewage Treatment Plant In Puchaczów (Stage Ii). The Scope Of Work Includes Construction, Installation And Technological Works. The Detailed Material Scope Of The Investment, Divided Into Industries And Remaining Works, Includes The Following Facilities And Internal Networks: Construction Works: - Preparatory Works Consisting In The Demolition Of Unnecessary Facilities And Cleaning The Area, I.E. Demolition Of The Foundation Slab Of The Mu 200 Bioblock (Object A), Demolition Of The Mechanical Sewage Treatment Building (Object B). - Renovation Of The Catchment Station - Facility No. 1 - Priming And Painting The Reinforced Concrete Shell Of The Tank - Renovation Of The Primary Sewage Treatment Grate - Object No. 2 - Construction Of The Cladding Of The Building Walls And Roof From Sandwich Panels. 12 Cm - Renovation Of The Raw Sewage Pumping Station - Structure No. 3 - Renovation Of The Reinforced Concrete Shell Of The Tank, Reconstruction Of The Sidewalk And Rim And Replacement Of The Tank Cover With Plastic Grates, Replacement Of The Ladder And External Door Joinery - Construction Of An Sbr Reactor And A Sludge Thickening Tank - Structure No. 4B, 5, 7 - Construction Of A Mechanical Sewage Treatment Building - Structure No. 6 - Installation Of Sectional Gates In The Dewatered Sludge Storage Room - Structure No. 8A- Construction Of A Pavement Strip In The Dewatered Sludge Storage Room - Structure No. 8B- Insulation Of Part Of The Building On The Sludge Collection Side - Structure No. 9 - Construction Of Poured Reinforced Concrete Footings And Footings, Foundation Walls Made Of Concrete Blocks, External And Internal Load-Bearing Walls Made Of Aerated Concrete Blocks, Flue Gas And Smoke Ducts Made Of Ceramic Blocks, Prefabricated Lintels, Columns, Beams, Lintels, Poured Reinforced Concrete Slabs, Ceiling Made Of Hollow Bricks On Prefabricated Beams, Monolithic Ring Beams, Partition Walls Made Of Ceramic Hollow Bricks, Damp-Proof Insulation, Thermal Insulation, Concrete Substrate, Industrial And Stoneware Floors, Internal Cement-Lime Plasters, External Mosaic Plasters, Thin-Layer Facade Plaster, Joinery (Warehouse Doors - System, Segmented, Manually Operated, External Door Joinery: Aluminum, Anti-Burglary Doors, Internal Door Joinery, Ei30 Steel Fire-Resistant Doors With A Door Closer, Window Joinery Made Of Multi-Chamber Pvc Profiles With Increased Thermal Insulation, Window Sills Made Of Stone Conglomerates, Tiles, Painting Of Wall And Ceiling Surfaces, Shower Cabins Made Of Hpl Boards, Sidewalk Strip - Object No. 15- Renovation Of The Control Room Rooms - Replacement Of The Entrance Door To The Room, Repair Of Plasters And Pai
|