Bids Are invited for Foam Pigging Of 10 Inch Line From Railway Siding To Pump House - Internal Cleaning, De-Sludging, And Flushing Of 10 Inch Nb Pipeline From Railway Siding To Pump House (Approx. 650 Mtrs) By Launching High-Density Open-Cell Polyurethane Foam Pigs. Scope Includes Mobilization Of Temporary Pig Launcher And Receiver Rated For Line Test Pressure, Certified Air Compressor/Pumping Equipment With Spark Arrestor, Progressive Pigging Runs (Swabbing, Scraping, And Final Drying Runs), Draining And Containment Of Flushed Product/Sludge Into Designated Slop Containers, Dismantling Of Temporary Traps, And Line Reinstatement With New Spiral-Wound Gaskets And Studs As Per Instructions Of Engineer-In-Charge , Foam Pigging Of 8 Inch Line From Railway Siding Crossing To Pump House - Internal Cleaning, De-Sludging, And Flushing Of 8 Inch Nb Pipeline From Railway Siding Crossing To Pump House (Approx. 110 Mtrs) By Launching High-Density Open-Cell Polyurethane Foam Pigs. Scope Includes Mobilization Of Temporary Pig Launcher And Receiver Rated For Line Test Pressure, Certified Air Compressor/Pumping Equipment With Spark Arrestor, Progressive Pigging Runs (Swabbing, Scraping, And Final Drying Runs), Draining And Containment Of Flushed Product/Sludge Into Designated Slop Containers, Dismantling Of Temporary Traps, And Line Reinstatement With New Spiral-Wound Gaskets And Studs As Per Instructions Of Engineer-In-Charge. , Foam Pigging Of 10 Inch Line From Twg Unloading Pump House To Tank Inlet Header - Internal Cleaning, De-Sludging, And Flushing Of 10 Inch Nb Pipeline From Twg Unloading Pump House To Tank Inlet Header (Approx. 150 Mtrs) By Launching High-Density Open-Cell Polyurethane Foam Pigs. Scope Includes Mobilization Of Temporary Pig Launcher And Receiver Rated For Line Test Pressure, Certified Air Compressor/Pumping Equipment With Spark Arrestor, Progressive Pigging Runs (Swabbing, Scraping, And Final Drying Runs), Draining And Containment Of Flushed Product/Sludge Into Designated Slop Containers, Dismantling Of Temporary Traps, And Line Reinstatement With New Spiral-Wound Gaskets And Studs As Per Instructions Of Engineer-In-Charge , Foam Pigging Of 6 Inch Line From Tanks Outlet To Tlf Pump House - Internal Cleaning, De-Sludging, And Flushing Of 6 Inch Nb Pipeline From Tanks Outlet (Tk-3/4 Manifold) To Tlf Pump House (Approx. 625 Mtrs) By Launching High-Density Open-Cell Polyurethane Foam Pigs. Scope Includes Mobilization Of Temporary Pig Launcher And Receiver Rated For Line Test Pressure, Certified Air Compressor/Pumping Equipment With Spark Arrestor, Progressive Pigging Runs (Swabbing, Scraping, And Final Drying Runs), Draining And Containment Of Flushed Product/Sludge Into Designated Slop Containers, Dismantling Of Temporary Traps, And Line Reinstatement With New Spiral-Wound Gaskets And Studs As Per Instructions Of Engineer-In-Charge. , Foam Pigging Of 6 Inch Line From Tlf Pump House To Tt Gantry - Internal Cleaning, De-Sludging, And Flushing Of 6 Inch Nb Pipeline From Tlf Pump House To Tt Gantry (Approx. 280 Mtrs) By Launching High-Density Open-Cell Polyurethane Foam Pigs. Scope Includes Mobilization Of Temporary Pig Launcher And Receiver Rated For Line Test Pressure, Certified Air Compressor/Pumping Equipment With Spark Arrestor, Progressive Pigging Runs (Swabbing, Scraping, And Final Drying Runs), Draining And Containment Of Flushed Product/Sludge Into Designated Slop Containers, Dismantling Of Temporary Traps, And Line Reinstatement With New Spiral-Wound Gaskets And Studs As Per Instructions Of Engineer-In-Charge. , Foam Pigging Of 3 Inch Tsv Line From Tlf Pump House To Tt Gantry - Internal Cleaning, De-Sludging, And Flushing Of 3 Inch Nb Thermal Safety Valve (Tsv) Bypass/Product Pipeline Running From Tlf Pump House To Tt Gantry (Approx. 325 Mtrs) By Launching High-Density Open-Cell Polyurethane Foam Pigs. Scope Includes Hook-Up Of Temporary Launchers/Receivers, Propellant Medium Supply, Progressive Pigging Runs To Eliminate Trapped Residual Heavy Hydrocarbons, Safe Disposal Of Drained Effluent Into Depot Slop Network, And Box-Up With Fresh Gaskets As Per Instructions Of Engineer-In-Charge. , Foam Pigging Of 3 Inch Railway Siding Header Line Connections - Internal Cleaning, De-Sludging, And Flushing Of 3 Inch Nb Railway Siding Header Line Connections (Approx. 250 Mtrs) By Launching High-Density Open-Cell Polyurethane Foam Pigs. Scope Includes Hook-Up Of Temporary Launchers/Receivers, Propellant Medium Supply, Progressive Pigging Runs To Clear Pipe Scales And Residual Product, Decanting/Slop Collection, Dismantling, And Line Box-Up With Fresh Gaskets As Per Instructions Of Engineer-In-Charge.
|