1. The Subject Of The Order Is The Execution Of Construction Works Including The Renovation Of The Dike Separating The Water Reservoir From The Sandela River, The Renovation Of The Reservoirs Inlet And Outlet Structures And The Development Of The Public Space Around The Artificial Water Reservoir Zalew, Located By The Sandela River, For Recreational Purposes.2.The Scope Of Work In The Part Concerning The Renovation Of The Dike Separating The Water Reservoir From The Sandela River, Along With The Renovation Of The Reservoirs Inlet And Outlet Structures, Includes In Particular: Preparatory Works, Earthworks Related To The Renovation Of The Dike, Strengthening The Water Slope Of The Dike, Strengthening The Crown And The Air Slope Of The Dike, Renovation Of The Discharge Well And Execution Of Finishing Works.3.The Scope Of Land Development Includes The Construction Of A Sensory Garden, A Childrens Playground With An Individually Designed Steel Structure Intended For The Installation Of Playground Equipment, An Outdoor Gym, A Jogging Route And The Construction Of Sidewalks And Walking Paths. It Is Also Planned To Install Small Architectural Objects, Including A Wooden Shelter, A Platform Made Of Composite Boards On The Causeway, Benches, Hammocks, Deckchairs, Waste Bins And Bicycle Racks. In Addition, The Scope Of The Investment Includes The Installation Of Electric Lighting And Monitoring, As Well As Planting Trees And Shrubs. An Internal Access Road Connecting Ul. Was Also Designed. Kopernika With Developed Area And Five Parking Spaces For Passenger Cars, Including One Space For People With Disabilities, Located On This Road.4.The Detailed Scope Of Work Is Specified In The Design Documentation And The Technical Specification For The Execution And Acceptance Of The Works Referred To In Art. 103 Section 1 Of The Act. Design Documentation, Technical Specification For The Execution And Acceptance Of Works, And Bill Of Quantities (Auxiliary Appendix) Constitute Annex No. 9 To Swz.5.Note: Changing The Surface Of The Access Road And Parking Lot From Concrete Cubes To Meba Openwork Slabs, Thickness. 8Cm.6.The Ordering Party Obliges The Contractor To Manage - On Its Own And At Its Own Expense - All Spoil From Earthworks And Demolition Works (The Ordering Party Does Not Indicate The Place Of Disposal Of The Spoil).7.According To The Design Documentation, Part Of The Dredged Excavated Material Is Intended For Re-Use Within The Investment Area - Including: For Modeling Slopes And Leveling The Terrain.8.The Ordering Party Reserves The Right To Waive Part Of The Scope Of Work - Up To A Maximum Of 10% Of The Amount Specified In The Contractors Offer. In Such A Situation, The Contractors Final Remuneration Will Be Reduced In Accordance With The Offer Cost Estimate Presented Before Signing The Contract.9.In The Design Documentation And The Technical Specification For The Execution And Acceptance Of Works, The Ordering Party Has Defined Quality Standards That Relate
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 119971007
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.