|
The Subject Of The Order Includes:1. Road Works, Including: - Cost Of Adjustments To General Requirements (Cost Of Compliance With The General Requirements Of The Contract And General Requirements Contained In The Technical Specifications, Development Of A Temporary Traffic Organization Project, Installation And Dismantling Of Tor, Industry Supervision, Laboratory Services, Construction Facilities), - Surveying Works (Measurement Works, Post-Construction Geodetic Inventory, Electronic Road Update (Ediom), Change Of Land Use, - Demolition Of Road And Street Elements, Fences, - Demolition Of Existing Culverts, - Clearing Of Trees, - Planned Temporary Traffic Organization, - Measurement And Earthworks, - Protective Pipes, - Adjustment Of Existing Manholes Of Underground Infrastructure, - Curbs And Concrete Edges, - Linear Drainage, - Asphalt Surface Of The Planned Road - Connection Of Ul. Szojdy And Ul. Towarowa, - Asphalt Surface Of The Planned Road - Reconstruction Ul. Targiela, - Aggregate Surface At The Exits Of Ul. Szojdy And Ul. Towarowa, - Paved Surface Of The Planned Sidewalk And Exits, - Surface Of The Bicycle Path, - Construction Of A Retaining Wall With Acoustic Screens Bridge Construction, Including: - Cost Of Adjustments To General Requirements, - Preparatory Works, - Foundations, - Reinforcement, - Concrete, - Insulation And Surfaces On Structures, - Drainage, - Bearings, - Expansion Joints, - Safety Elements, - Other Bridge Works.4. Industry Works, Including: - Stormwater Drainage, Including: • Earthworks, • Installation Of Stormwater Drainage Networks, • Dn1200 Rainwater Wells, • Rain Inlets, • Earthworks For The First Open Ditch, • Earthworks For The Second Open Ditch, • Construction Of A Culvert (Pa-Pa, Ditch I), • Construction Of A Culvert (Pb-Pb), • Construction Of A Culvert (Pc-Pc), • Construction Of A Culvert (Pd-Pd, Ditch Ii), • Reconstruction Of Embankments, • Construction Of Dn400 Culverts And Construction And Strengthening Of The Ditch At Ul. Targiela, • Construction Of Culverts Dn400 (Other).- Sanitary Sewage System, Including:• Demolition Of Sanitary Sewers,• Demolition Of Sanitary Wells,• Earthworks,• Horizontal Hdd-Controlled Drilling,• Installation Of A Sanitary Sewage System,• Dn1200 Sanitary Wells,• Well Accessories,• Finishing Works.- Street Lighting, Including:• Cable Line With Accompanying Works,• Reconstruction Of Lighting Lanterns,• Installation Of Poles Anodized Aluminum Lighting And Lighting Fixtures Along With Accompanying Works, • Measurement Works. - Construction Of A Technological Channel, Including: • Construction Of Ktu And Ktp Cable Ducts Along With Wells And Accompanying Works. A Detailed Description Of The Order And The Method Of Its Execution Is Specified In The Bid Cost Estimate And Design Documentation, Prepared For The Purposes Of This Order, Constituting Annexes No. 2 And 3 To The Swz, Respectively.
|