|
1. The Subject Of The Order Is The Performance Of Construction Works As Part Of The Task Entitled: Modernization Of The Front Of The Kwadrat Theater Named After Edward Dziewoński At Ul. Marszałkowska 138 In Warsaw, Along With All Preparatory, Dismantling, Repair, Assembly, Sheet Metal, Sealing, Finishing, Security And Cleaning Works Necessary For The Complete Implementation Of The Task.2. The Subject Of The Order Is The Execution Of Construction Works Including The Modernization Of The Existing Frontage/Roof Of The Main Entrance To The Kwadrat Theatre, Together With The Execution, Delivery, Assembly, Connection And Commissioning Of A New Light Sign/Neon Kwadrat Theater And The Logo, Delivery, Assembly, Connection And Commissioning Of Side Monitors And Front Screens In The Windows, As Well As All Preparatory, Dismantling And Repair Works, Assembly, Sheet Metal, Installation, Sealing, Finishing, Security And Cleaning Necessary To Obtain A Complete And Lasting Effect In Accordance With The Design Documentation, This Opz, Applicable Regulations And Principles Of Technical Knowledge.3. The Works Will Be Carried Out Next To An Active Public Utility Facility, In The Immediate Vicinity Of The Sidewalk And Road Of The Street. Marszałkowska In Warsaw.4. A Detailed Description Of The Subject Of The Order Is Included In Annex No. 1 To The Swz - Description Of The Subject Of The Order (Opz), Design Documentation Project Of Renovation And Modernization Of The Front Of The Entrance Roof To The Kwadrat Theatre, Technical Specification For The Execution And Acceptance Of Construction Works And The Draft Provisions Of The Agreement.5. The Minimum Warranty Period For The Works Performed And Materials Used Is (Depending On The Contractors Offer) 3 Years From The Date Of Signing The Final Acceptance Report Without Any Reservations Or From The Date Of Removal Of Defects Found During Acceptance.6. Wherever The Documentation Indicates Specific Names, Materials, Technologies, Standards Or Certificates, The Ordering Party Allows Equivalent Solutions That Meet Requirements No Worse Than Those Indicated, After Demonstrating Equivalence And Obtaining The Ordering Partys Acceptance.
|