The Scope Of The Order Includes: The Scope Of Work Includes: Task 1 Construction Of A Bicycle Path In The Town Of Jarków - Section Abconstruction Of A Bicycle Path With A Bituminous Surface (Width 3.00 M) And Roadsides Paved With Aggregate (Width 0.50 M), In The Lewin Kłodzki Commune, On Plots No. 39/4, 100/3, District 0004 Jarków (Length Of The Bicycle Path: 660 M, Transverse Slope Of The Bicycle Path: Roof Slope 2%). To Implement The Above-Mentioned Scope Of Work, It Is Necessary To Perform: Earthworks, Construction Of A Bituminous Road, Construction Of Roadsides Made Of Aggregates, Felling Of Trees, Implementation Of Temporary And Final Traffic Organization (Including The Necessary Signage), Tidying Up The Area. Task 2 Construction Of A Bicycle Path In The Town Of Jarków - Section Bconstruction Of A Bicycle Path With A Bituminous Surface (Width 3.00 M) And Roadsides Paved With Aggregate (Width 0.50 M), In The Lewin Kłodzki Commune, On Plots No. 38/5, 101/2, District 0004 Jarków (Length Of The Bicycle Path: 83 M, Transverse Slopes To The Roadside Green Areas And Roadsides, Which Are Elements Of The Road. To Complete The Above-Mentioned Scope Of Work, It Is Necessary To Perform: Earthworks, Construction Of A Bituminous Road, Construction Of Roadsides Made Of Aggregates, Implementation Of The Target Traffic Organization (Including The Necessary Markings), Tidying Up The Area. Task 3. Construction Of A Bicycle Path In Taszów - Section A. Construction Of A Bicycle Path With A Bituminous Surface (4.00 M Wide) And Hardened Roadsides. Aggregate (Width 0.50 M) In The Lewin Kłodzki Commune On Plots No. 126, 127, 128, 129/1, Taszów District (Length Of The Bicycle Path: 750 M, Transverse Slope Of The Bicycle Path: Roof Slope 2%). Cutting Down Trees In Accordance With The Decision Of The Starosta Of Kłodzko, Temporary And Target Traffic Organization (Including The Necessary Markings), Construction Of New Green Areas, Tidying Up The Area. Task 4. Construction Of A Bicycle Path In Taszów - Section Bconstruction Of A Bicycle Path With A Length Of 82 M With A Bituminous Surface (Width Of 3.00 M), Construction Of Roadsides Paved With Aggregate, 0.50-0.75 M Wide In The Commune Lewin Kłodzki On Plot No. 129/1, Precinct 0014 Taszów, Separating The Bicycle Path From A Private Road Made Of Aggregate Using A 15X22 Cm Concrete Curb Placed On A 10 Cm Thick C12/15 Concrete Bench With A Resistance (Curb Clearance - 2 Cm), Road Slope On One Side 2%. To Complete The Above-Mentioned Scope Of Work, It Is Necessary To Perform: Earthworks, Construction Of A Bituminous Road, Foundation Of An On-Ramp Curb, Construction Of Roadsides Made Of Aggregate, Felling Of Trees, Final Traffic Organization (Including The Necessary Markings), Tidying Up The Area. Task 5 Construction Of A Bicycle Path In Witów - Section Abconstruction Of A Bicycle Path With A Bituminous Surface (3.00 M Wide) And Hardened Roadsides Aggregate (Width 0.60 M), In The Lewin Kłodzki Commune, On Plots No. 44, 45, 47
|