Construction Work – New Construction Of Zweidsporthalle Lot 15 Earthworks And Groundwater Management. Earthworks - Construction Site Setup Earthworks - 3,560 Sqm Clearing The Building Site, Removing Vegetation - 4 Hours Tree Felling With Clearing Roots - Construction Dirt And Root Protection Measures - 50 Sqm Horizontal Standard Shoring H Bia 2.1 M - 350 Cbm Of Topsoil, Remove, Dispose Of - 3,560 Cbm Of Soil Excavate, Dispose Of, Depth Up To 2.10 Uok Terrain - Produce 2,150 Sqm Of Sole, Line It With Fleece - Deliver And Install 1,480 M² Of Foundation Padding Made Of Mineral Mixture - Create 1,100 Sqm Of Paved Construction Site Area - 210 Sqm Of Root Protection Panels On Geo-Fleece Groundwater Management Construction Site Equipment Water Management Incl. Power Connection Groundwater Lowering As A Needle Filter System With 18 Wells R 0.05M D Up To 2.5M Flush In 250 Supply, Install And Dismantle Ring And Collecting Pipe 25 Cbm Of Hydraulic Stones For The Discharge Structure. Creation Of An Infiltration And Infiltration System For Trees
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 119851224
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.