Siteworks – Basic Repairs To The Road Including Ancillary Areas And Conversion Of The Stops. The Hamburg State Office For Roads, Bridges And Waterways Is Operating The Construction Project For Metrobus Line 3 - Rothenburgsort Stops. This Construction Project Includes The Replanning Of The Billhorner Rohrendamm - Vierländer Damm - Ausschläger Allee Street Between Billhorner Mühlenweg And Rothenburgstraße. The Subject Of This Tender Is The Construction Project For The Billhorner Mühlenweg Bus Stop, At The Billhorner Mühlenweg / Billhorner Rohrendamm Intersection. The Main Services Are: Removing Asphalt, Loosening 5,400 M² Of Soil And Conveying It To The Trough, Producing 1,680 M³ Of Road Gullies, Producing 28 Pieces Of Dn 160 Plastic Pipeline, Producing 190 M Of Base Layer Made Of Natural Gravel 0/32, Producing 3,590 M² Of Layer Of Frost-Resistant Material, Producing 100 M³ Of Consolidation Layer For Bk 32 Roadway, 3,250 M² Produce Asphalt Base Course, Asphalt Binder And Asphalt Surface Course For Bk 32 Roadway 10,410 M² Produce Asphalt Base And Top Layer For Bk 0.3 Roadway 560 M² Produce Bus Traffic Areas Made Of Concrete 350 M² Create Watercourse Ma 8 S / Ma 8 N 170 M² Set Granite Curbs 780 M Set Concrete Curbs 1,060 M Set Special Bus Curbs 78 M Lay Concrete Paving Stones 25/25/7 3,270 M² Lay Load-Distributing Plastic Grid 210 M² Create Road Markings 1,405 M Create Red Area Markings In Cycle Paths 160 M² Excavate Tree Pits 11 Pcs
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 119851166
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.