Construction Work For Buildings Of Further Education – Los 05 - Rohbauarbeiten. The Construction Of A New Railway Tunnel Training Facility Is Planned For The Thuringian State Fire Brigade And Disaster Protection School, Crossen Branch. The Tendered Services Include All Shell Construction Work For The Construction Of The Tunnel System With The Associated Functional Building, Including All Necessary Formwork, Reinforcement, Concrete, Prefabricated Parts And Ancillary Services. # Overview Of Services: 110 Pieces Of Bored Pile Heads (Ø 90 Cm), 150 Cm; 925 M³ Strip Foundations, Haunched, C30/37; 2,160 M² Floor Slab, Reinforced Concrete, 40 Cm, C30/37; 1,800 M² Clean Layer, C12/15, X0, D= 5 Cm, Unreinforced Concrete, Sloped Substrate; Create 1,860 M² Of External Wall From Prefabricated Elements, D = 25 Cm, Panel Length 5.00 To 5.25 M; 285 M³ Right Beam, 0.50/1.55-1.20/13.60 M, Console On Both Sides, Prefabricated Part; 1,420 M² Prefabricated Ceiling Slab, Stb. Lc 30/33, D = 20 Cm, Span Up To 4.50 M; 1,485 M Ring Earth Electrode As Flat Strip Steel V4a 30 X 3.5 Mm, Upright As Horizontal Earth Electrode; 115 M³ Standard Tunnel Outer Support 50X50 Cm, Axis A-B/9-32, Prefabricated Part; 970 M² Filigree Ceilings, Reinforced Concrete C25/30, Thickness 6+19 Cm; 840 M² In-Situ Concrete Walls Reinforced Concrete, C25/30, D= 25 Cm, 4.60 M - 12.75 M
|