Test Drilling And Boring Work – Köhlbrand Crossing - Subsoil Investigation On The Water Side, Lot 3. As Part Of The General Subsoil Investigation, A Total Of 33 Water-Side Dry Boreholes With Continuous Soil Sampling And 36 Water-Side Pressure Soundings (Cpt) Are Planned. Of These, There Are 3 Dry Drillings And 2 Pressure Soundings In The Pylon West Land Reclamation Area And 7 Dry Drillings And 7 Pressure Soundings In The Dismantling Of The Old Köhlbrand Bridge In Rugenberger Hafen And Travehafen. The Planned Drilling Depths For The Dry Drillings Are Expected To Be Between 30 M And 70 M. Depending On The Drilling Results, A Greater Drilling Depth May Be Necessary In Individual Cases. The Pressure Soundings Are Carried Out Until The Device Capacity Is Reached.
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 119806235
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.