|
Supply Of smps based ips , supply , installation & commissioning of smps based integrated power supply (ips) system a s per rdso/spn/165/2023, version 4.0, amendment 1 or latest, along with surge protection device , status monitoring panel, spares, toolkit, lm/lab battery consisting of 55 plus 5 cells (cells as per rdso specificati on irs:s-88/2004 or latest) along with battery stand. the configuration of ips shall be as per drawing no. j hs/s/305/typ.drg/ips/2025/01- enclosed for relay hut/lsc with aftc,axle counters and lc gate. this inclu des transportation to consignee depot, from consignee depot to site, installation and commissioning of inte grated power supply system after duly filled the pre-commissioning checklist jointly by rdso approved ven dor and railway representative. [ warranty period: 48 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] , supply, installation, testing and commissioning of smps based integrated power supply (ips) system as per no. rdso/spn/165/2023 ver 4.0 amdt. 1 or latest along with surge protection device, statu s monitoring panel, spares, tool kit, lmla battery consisting of 55 plus 5 cells (cells as per rdso spec irs: s-88/2004 or latest) along with battery stand. the configuration of ips should be as per ncr/hq drawing n o. typ/2017/0002-11 for relay hut/lsc with aftc, axel counter and lc gate. this includes transportation t o consignee depot, from consignee depot to site, installation and commissioning of integrated power sup ply system (ips) after dully filling pre commissioning check list jointly by rdso approved vendor and railwa y representative. [ warranty period: 48 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ] , supply, installation, testing and commissioning of smps based integrated power supply (ips) system as per no. rdso/spn/165/2023 ver 4.0 amdt. 1 or latest along with surge protection device, statu s monitoring panel, spares, tool kit, lmla battery consisting of 55 plus 5 cells (cells as per rdso spec irs: s-88/2004 or latest) along with battery stand. the configuration of ips should be as per ncr/hq drawing n o. typ/2017/0002-11 for relay hut/lsc with aftc, axel counter and lc gate. this includes transportation t o consignee depot, from consignee depot to site, installation and commissioning of integrated power sup ply system (ips) after dully filling pre commissioning check list jointly by rdso approved vendor and railwa y representative. [ warranty period: 48 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
|