1.1. The Subject Of The Order Includes The Execution Of The Task Entitled: Modernization And Adaptation Of Public Buildings - The Complex Of Cofferdams V And Vi At Aleja Św. Jana Pawła Ii 1-2 In Toruń. 1.2.The Subject Of The Order Includes In Particular The Following Scope Of Work: Grodza V Eastern: 1) Earthworks And Demolition Works, Such As: Removal Of The Fertile Layer Thick. 30 Cm, Excavating External Walls To A Depth Of 150 Cm, Digging Out Recesses, Demolishing Floors, Removing Rubble, Backfilling Recesses Of The Building, Backfilling The Space Behind The Walls Of The Building, 2) Conservation Works Such As: Removing Fungus From The Walls, Demolishing The Brick Wall, Desalination Of The Walls, Strengthening The Walls, Supplementing The Gothic Brick Walls, Sewing The Wall With Steel Anchors, Hydrophobization Substrates, 3) General Construction Works Such As: Making Light Aggregate Sleepers, Making Concrete Sleepers, Making Floor Tiles, Completing Brick Walls, Installing Frames With Glass In Window Openings, Installing Internal And External Doors, Installing Toilet System Walls, Making Insulation From Thermally Weldable Felt, Making Identification Inscriptions On The Facade, 4) Making Electrical And Low-Voltage Installations, Making Electrical Connections And Low-Current,5) Construction Of Sanitary Installations, Ventilation And Heating Installations, Water Connection And Sewage Connection,6) Greenery Works Such As: Laying Fertile Soil, Construction Of Lawns, Bulkhead Vi Western: 1) Earthworks And Demolition Works Such As: Removal Of Fertile Layer Thickness 30 Cm, Excavating External Walls To A Depth Of 150 Cm, Digging Out Recesses, Dismantling Floors, Removing Rubble, Backfilling Building Recesses, Backfilling The Space Behind The Building Walls, 2) Conservation Works Such As: Removing Mold From Walls, Demolishing Brick Walls, Desalination Of Walls, Strengthening Walls, Supplementing Gothic Brick Walls, Sewing Walls With Steel Anchors, Hydrophobization Of Substrates, Restoration Of The Door From The Valley Of Dreams Side, 3) General Construction Works Such As: Making Light Aggregate Sleepers, Making Concrete Sleepers, Making Floor Tiles, Completing Brick Walls, Installing Door Frames With Glass In Window Openings, Installing Internal And External Doors, Installing Toilet System Walls, Making Insulation From Heat-Sealable Felt, Making Identification Inscriptions On The Facade, 4) Making Electrical Installations And Installations Low-Current, Construction Of Electrical And Low-Current Connections, 5) Construction Of Sanitary Installations, Ventilation And Heating Installations, Construction Of Water And Sewage Connections, 6) Greenery Works Such As: Laying Fertile Soil, Laying Lawns. 1.3. The Contractor Will Complete The Subject Of The Order To The Extent And In The Manner Specified In The Design Documentation And The Technical Specification For The Execution And Acceptance Of Construction Works [Studies Prepared By Piotr Bielecki, Running A Bu
|