1. The Subject Of The Order Titled: Comprehensive Solution Of The Sewage Treatment System In Tykocin Is Comprehensive Design, Obtaining The Required Agreements And Decisions, Construction, Equipment, Commissioning, Training Of The Employers Staff, Changing The Location Of Existing Photovoltaic Panels In Consultation With The Employer And Designing Their Connection To The New Infrastructure Of The Sewage Treatment Plant As A Whole, And Commissioning A Complete Sewage Treatment System In Tykocin, In The Design And Build Formula, In Accordance With The Documents Constituting Annexes To The Swz, Including, Among Others, The Functional And Utility Program (Annex No. 1 A To The Swz) Together With The Attachment Criteria For The Equivalence Of Process Technology And Key Equipment Constituting Jointly Annex No. 1 B To The Swz, Climate Risk Analysis Constituting Annex No. 1C To The Swz, Requirements For Key Personnel Constituting An Annex To The Contract, The Decision On Environmental Conditions Riś.6220.1.2025.Am Of July 1, 2025, Constituting Annex No. 1 K To The Swz, The Decision On Determining The Location Of A Public Purpose Investment Rnz.6733.3.2025.Sg Of September 1, 2025, Constituting Annex No. 1 L Of The Swz, Geotechnical Report Constituting Annex No. 1 D To The Swz. 2. The Ordering Party Also Attaches The Bill Of Quantities Constituting Annex No. 1 J To The Swz As An Auxiliary Document.3.As Part Of This Order, The Task Of Expanding And Rebuilding The Sewage Treatment Plant Located In Tykocin, Plot No. 1396, Geodetic District 0034 Tykocin, Ul. Holendry 27, Białystok District. On The Plot There Is A Currently Operating Sewage Treatment Plant Intended For Expansion And Reconstruction. Entrance To The Plot Is From The Public Road, District Road No. 1189, Ul. Holendry 27 Through The Existing Exit. The Plot Is The Property Of The Investor And Is Intended For The Planned Investment.4.The Treatment Plant Will Be Intended For The Treatment Of Municipal Sewage From The Tykocin Commune (Domestic And Commercial Sewage). 5. The Subject Of The Order Includes: 1) Design - Development Of Complete Design Documentation, Consisting In Particular Of The Final Multi-Discipline Conceptual Design, Construction Design, Detailed Design, Stwior Execution Cost Estimate, In Accordance With The Conditions Indicated In The Functional And Utility Program, 2) Execution Of Construction Works In Accordance With The Developed And Approved Documentation Referred To In Point 1 Above, Regarding The Task Of Construction Of Infrastructure Along With The Necessary Construction Equipment In The Tykocin Commune And Obtaining An Occupancy Permit Decision On Behalf Of And On Behalf Of The Ordering Party, 3) Performing Authors Supervision Over The Execution Of Construction Works Based On The Documentation, 4) Performing Other Obligations Imposed On The Ordering Party As The Investor Necessary For The Design And Construction, As Well As Putting Into Use Of The Investment, And The Obligations
|