|
Bids Are invited for Custom Bid For Services - Topography And Geotechnical Survey For Rerouting Of 4 In Pipeline Of Centuryenka Spurline Under Kppl Pune - Survey Works , Conducting Topographical Ground/Land Survey In The Specified Proposed Pipeline Route As Shown In The Tender Drawings By Conventional/Gps Or Any Other Standard Method, Covering Details Of Physical Features Like Rivers, Nallahs, Lakes, Ponds, Wells, Pits, Forest, Trees, Roads, Culverts, Transmission Lines, Telegraph/ Telephone And Electric Poles, Underground Or Any Other Services, Cross Drainage Works Including Cross Sectional Details Of Nallah Etc. Including Establishing High Flood Level With Source Of Information, Identification Of Any Monument, Historical Structure, Wild Life Sanctuary In The Vicinity, Storm Water Disposal Point With Levels, Cross-Section Details Of Nallah, Recording Spot Levels, Including Providing In Tabulation Girth Wise No. Of Trees Etc As Specified, Plotting And Developing Topographical Contour Maps, Showing True North Including Establishing Survey Reference Stations, Key Plan Etc. Including All Equipments, Instruments, Personnels, Clearing Of Bushes As Per Requirement For Intervisibility To Carry Out Survey Work Etc. , Scope Includes Preparation And Submission Of Proposed Pipeline Alignment Sheet Of Recommended Route And Submission Of Pdi Report, Complete Work In All Respects As Per Drawings, Specifications And Directions Of Engineer-In-Charge Including Submitting Hard Copies Of Drawings/Map And Supply Of Electronic Files. , Geo Technical Investigation , Conducting Soil Investigation With Boring Of Minimum150mm Dia. Boreholes Of Maximum 10M Depth Including All Field Tests And Laboratory Tests, Mobilization And Demobilization Of Equipments & Personnel Etc. For Soil Investigation For Area Location . Complete Work In All Respects As Per Drawings, Specifications And Directions Of Engineer-In-Charge Including Submitting Hard Copies Of Reports & Recommendations And Supply Of Electronic Files.
|