1. The Subject Of The Order Are Construction Works Consisting In The Construction Of Additional Street Lighting In Towns In The Rawicz Commune, Carried Out As Part Of The Budget Task Entitled: Construction Of Lighting In The Rawicz Commune.2.The Subject Of This Order Has Been Divided Into The Following Parts: 1) Part 1 - Construction Of Street Lighting In Zawady, Masłowo, Słupia Kapitulna, Żylice, Sarnówka, Folwark: A) Construction Of Lighting In Zawady, B) Construction Of Lighting On Ul. Modrzewiowa In Masłowo, C) Construction Of Lighting On Ul. Niemarzyńska In Słupia Kapitulna, D) Construction Of Lighting In Żylice, E) Construction Of Lighting In Sarnówka (Near The Pod Topolami Restaurant), F) Construction Of Lighting On Ul. Fiołkowa In The Village Of Folwark, 3.The Scope Of Work During The Execution Of The Order Includes The Performance Of All Construction Works In Accordance With Applicable Regulations, In Particular: A) Street Lighting Cable Lines: Vertical Excavations, Mechanical Drilling, Digging Trenches, Filling Layers Of Sand At The Bottom Of The Cable Trench, Backfilling Trenches For Cables, Removal Of Excess Soil, Laying Protective Pipes, Laying Cables. B) Installation Of Poles And Fixtures: Assembly And Erection Of Poles, Assembly Of Booms, Assembly Of Cables For Lighting Fixtures, Assembly External Lighting Fixtures On The Boom, Connecting Cables, Marking The Pole, Installation Of Horizontal Earthing Electrodes, Mechanical Insertion Of Vertical Rod Earthing Electrodes.C) Measurements: Testing Of The Cable Line, Measurement Of Electrical Insulation Resistance, Checking Of Automatic Power Supply Shutdown - Measurement Of Short-Circuit Loop Impedance, Checking Of Automatic Power Supply Shutdown - Measurement Of Earthing Resistance.D) Other Costs: Costs Of Surveying Services And Preparation Of A Surveying Inventory As-Built.E) All Other Accompanying Works Necessary For The Proper Execution Of The Order, Including, In Particular, Proper Security Of The Works, Temporary Traffic Organization And Restoration Of The Area To Its Previous Condition, Including Possible Restoration Of Damaged Surfaces With Paving Stones And Green Areas With Sowing Grass.4.Detailed Requirements And Guidelines Of The Ordering Party Are Included In Chapter Iii Of The Swz.
|