|
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard In Ships At Naval Dockyard, Mumbai/ L1 Firm Premises; 3 Years Rate Contract For Routines And Repairs On Major Firefighting And Fixed Firefighting Onboard In Ship.. - Routine On Halon, Khladon And Co2 Cylinders : Degutting And Shifting Of Cylinders From Ship To Shop Floor , Retrieving Of Extinguishing Agent From Cylinders At Peso Certified Facility , Chemical Cleaning Of Cylinders At Peso Certified Facility , Endoscopy Test Of Cylinders Post Chemical Cleaning , Ultrasonic Thickness Gauging Of Cylinders , Overhauling Of Cylinder Head Valve Assembly , Hydraulic Pressure Testing Of Cylinders At Peso Certified Facility As Per Gas Cylinder Rules-2025 , Nitrogen Pressure Testing Of Cylinder Along With Head Valve Assembly , Charging Of Extinguishing Agent In Cylinder At Peso Certified Facility , Painting Of Cylinders , Regutting And Shifting Of Cylinders From Shop Floor To Ship , Routine On System Pipelines And Valve : Survey And Renewal Of System Pipelines (Dia – 10 Mm To 50 Mm) , Survey And Renewal Of System Pipelines (Dia 51 Mm To 100 Mm) , Blowing Through Of System Pipelines With Lp Air , Overhauling Of System Valves Including Removal And Fitment Onboard , Serviceability Checks Of Nozzles In The System , Welding Of Cylinders Base Plates As Per Required Position , Routines On Monitoring And Control Panel : Functional Checks Of Monitoring And Control Panels , Calibration Of Various Gauges (Pressure, Temperature, Voltage And Current) , Calibration Of System Solenoid Valves , Survey And Renewal Of Control Supply Cable , Routines On Foam Based Firefighting System: Cleaning Of Foam Compound Containing Tanks , Pressure Testing Of Foam Compound Tanks , Survey And Renewal Of Flexiable Hoses , Calibration Of Pressure Gauges , Overhauling Of Foam Generating Pump , Insitu Weighing Of Cylinders And Charging Of Gas If Required , Renewal Of System Cylinders Securing Brackets
|