Construction Work – Storm Overflow Basin, Weyermannshaus, 211 Construction Work, Tp1: Rain Basin And Stöckackerstrasse. Architectural Work Including Special Foundation Engineering (Sheet Pilings, Riveting Walls, Piles) For A Rain Basin On The Weyerli Site And The Upstream Wastewater Structures And Canals In Stöckackerstrasse. Main Quantities: Removal Of Top And Subsoil: 150 M3 Covering: 250 T Excavation (And Removal): 17,300 M3 (Construction Pit + Pipe Trench) Sheet Pile Walls: 2,500 M2 Rising Walls, Removable: 1,880 M2 Nail Wall: 120 M2 Self-Drilling Anchors: 160 M Construction Concrete: 1,900 M3 Formwork: 6,750 M2 Sewer Systems: 105 M Cable Protection Pipes: 700 M Service Lines: 1500 M Edges: 900 M Product/Brand/Design Or Type Names Are Omitted. If, In Exceptional Cases, Such Designations Are Listed, Equivalent Alternatives Are Permitted. Equivalence Must Be Proven By The Provider.
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 119674993
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.