1. The Subject Of The Order Are Construction Works Consisting In Adapting The Building Of Primary School No. 14 In Kalisz To Fire Protection Requirements In The Scope Of Stage I Regarding The Reconstruction Of The K2 Staircase, Based On The Documents Specified In Point 4.5 Of Swz.2. The Material Scope Covered By These Proceedings Includes Construction Works Consisting In Adapting The Building Of Primary School No. 14 In Kalisz To Fire Protection Requirements In The Scope Of Stage I Regarding The Reconstruction Of The K2 Staircase And Includes In Particular: 1) Demolition And Dismantling Works, 2) Reconstruction Of Door Openings (With Pvc Lining), 3) Replacement Of Door Joinery, 4) Construction Of Fire Separation Walls, 5) Reconstruction Of The Flat Roof For Installation Smoke Exhaust Flap And Covering The Roof With Thermally Welded Felt, 6) Installation Of A Smoke Exhaust System For The Staircase, Fire Alarm System, Installation Of Emergency Lighting, 7) Installation Of Safety Signs, 8) Reconstruction Of External Stairs, 9) Painting Of Walls And Ceilings, Paneling Up To A Height Of 1.50 M, 10) Delivery And Installation Of A Gp-2X Abc Fire Extinguisher, 11) Other Accompanying Works Necessary For The Proper Execution Of The Order. Note: 1) Due To The Fact That The Building Is In Constant Use And Will Remain So For The Duration Of The Works, As Well As Due To The Specific Nature Of The Facility, The Employers Requirement To Agree With The Facility User On The Method And Sequence Of Carrying Out The Works Within The Established Work Schedule Must Be Strictly Adhered To. 2) The Works Must Not Disrupt The Functioning Of The Facility. The Contractor Is Obliged To Conduct Them In Such A Way As To Ensure The Proper Functioning Of The Facility (Including Conducting The Eighth-Grade Exam On May 10-12, 2027), With Particular Emphasis On The Nature Of The Facility And The Safety Of Students Attending The School. The Most Burdensome Works Should Be Carried Out During Hours When There Are No Classes Or During Periods When The School Is Not Open (Holidays, Holidays, Working Days During Christmas Breaks, Etc.).3) The Contractor Will Provide The Necessary Utilities (E.G. Water, Electricity) On His Own And At His Own Expense (E.G. Water, Electricity) To Operate The Construction Site For The Duration Of The Construction Works. The Contractor Should Also Take Into Account The Above Circumstances Of Order Execution When Preparing The Offer.3. As Part Of The Subject Of The Order, The Contractor Is Also Obliged To Perform All Preparatory Works, Secure The Construction Site, Clean-Up Works, Maintain The Construction Facilities, Prepare A Bioz Plan (If Applicable), Organize The Construction Site (Including The Necessary Utilities To Perform The Subject Of The Contract), Provide Surveying Services, To Resume Surveying Marks In The Event Of Their Destruction, Damage Or Displacement During The Works, In The Event Of The Need To Occupy The Road For The Duration Of The Above-M
|