1. The Subject Of The Order Is The Reconstruction Of The Building Of The Social Services Center, Consisting In Adapting The Underground Floor To Serve As A Temporary Shelter.1.Reconstruction Of The Building Of The Social Services Center, Consisting In Adapting The Underground Floor To Accommodate An Emergency Shelter, Located In Kozienice. The Investment Will Be Implemented As A Dual-Use Investment. The Underground Floor Of The Building, After Its Adaptation, Will Have A Double Function: It Will Be An Mds Function During The Emergency, And In The Remaining Time It Will Be An Economic/Warehouse/Technical Function. The Facility Will Be Constructed In Accordance With The Solutions Adopted In The Design Documentation And Applicable Regulations, Including The Regulation Of The Minister Of Internal Affairs And Administration Of July 9, 2025. On The Conditions For Organizing And Requirements To Be Met By Places Of Emergency Shelter. The Subject Of The Order Includes The Execution Of The Subject Of The Order In Rooms With A Dual-Use Function (The Main Purpose Is For Civilian Purposes). The Scope Of Works Includes Comprehensive Execution Of All Construction Works Related To The Implementation Of The Task, Including Preparatory, Auxiliary And Accompanying Works, Development Of As-Built Documentation, Delivery And Installation Of Equipment.1.1.The Task Includes: 1.Disassembly Works, Including Gas, Water And Electricity Installations Related To The Operation Of The Gas Heating Network,2.Demolition Works, Including Piercing, Plaster Chipping, Dismantling Of Partition Walls, Door Joinery, Elements Of Evacuation Equipment, Water, Sewage And Electrical Installations,3.Carpentry Works - Joining Ceilings And Window Lintels, 4.Masonry Works, Including The Separation Of A Storage Room, A Gas Boiler Room And Sanitary Facilities,5.Construction Of A Monolithic Roofing Slab Along With Its Waterproofing, Sheet Metal Work And Installation Of External Drainage, 6.Installation Of Gas Boiler Room Equipment, Including Gas Connection, Furnace And Active Gas Safety System With Shut-Off Valve,7.Installation Of Joinery And Door Joinery Equipped In Accordance With The Intended Use Of The Rooms,8.Reinforcement Of The Ceiling Using Structures Made Of Steel Profiles Protected Against Corrosion,9.Filling The Gaps Between The Structure Elements And The Ceiling Structure With Non-Shrink Mortar, 10.Local Repairs Of Concrete And Reinforced Concrete Walls And Basement Ceilings11.Headlining Made Of Trapezoidal Steel Sheet, Protected Against Corrosion, 12.Installation Of Independent Supply And Exhaust Gravity Ventilation, 13.Installation Of The Exhaust-Air System,14.Construction Of Water And Sewage Installations,15.Installation Of Sanitary Fittings, Electrical Equipment, Including Emergency Lighting Fixtures, 16.Installation Of Mds Equipment Elements, Including New Hatches And Gas-Tight Emergency Hatches On The Windows,17.Repair And Finishing Works, Including Plastering, Flooring, Waterproof
|