The Subject Of The Order Is The Performance Of Construction And Conservation Works In A 19Th-Century Wooden And Stone Residential Building In Kamienica Polska. Detailed Description Of The Subject Of The Order: The Adopted Design Solutions Assume: - Partial Demolition Of The Current Building, - Construction Of New Foundation Walls Cast On Site With Waterproofing, - Construction Of New External And Internal Walls Made Of Solid Brick And Wooden Logs, Along With Their Plastering On Both Sides, - Construction Of New Floors On The Ground Along With With The Necessary Waterproofing And A Layer Of Insulation, - Construction Of A Wooden Beam Ceiling Above The Rooms With Formwork And Insulation On The Attic Side, - Construction Of A New Roof Truss Structure With A New Wooden Shingle Covering, - Construction And Installation Of New Casement Windows And Panel Doors In The Building, - Construction Of A New Electrical Installation And All Other Installations Necessary For The Functioning Of The Building In Accordance With Its Intended Purpose. When Carrying Out The Above Works, It Is Planned To Re-Install All The Preserved In Good Condition Condition Of Elements From The Current Building, Such As: Fragments Of Wall Beams, Ceiling Beams, Windows, Bricks, Whose Technical And Biological Condition Allows It. A Detailed Description Of The Subject Of The Order Is Included In The Technical Documentation: - Architectural And Construction Design (Annex No. 1 To The Swz), - Technical And Structural Design (Annex No. 2 To The Swz), - Technical Opinion (Annex No. 3 To The Swz), - Mycological Expertise With An Annex (Annex No. 4 To Swz), - Technical Design - Electrical Industry (Annex No. 5 To Swz), - Technical Design - Sanitary Industry (Annex No. 6 To Swz), - Bill Of Quantities - Architecture (Annex No. 7 To Swz), - Bill Of Quantities - Electrical Industry (Annex No. 8 To Swz), - Bill Of Quantities - Sanitary Industry (Annex No. 9 To Swz), - Stwiorb (Annex No. 10A, 10B, 10C To Swz). Note: The Ordering Party Will Provide The Contractor With A Truss And Formwork That Is Approximately 90% Complete. If Anywhere In The Swz (Technical Documentation), The Ordering Party Indicated Specific Names Of Materials Or Included Other Content That Directly Or Indirectly Indicates Or May Indicate A Specific Product, It Means That It Did So In Order To Clarify The Description Of The Subject Of The Order And Specify The Minimum Expectations As To The Quality Of The Products To Be Used To Perform The Subject Of The Order. When Preparing The Offer, The Ordering Party Allows The Use Of Equivalent Materials, I.E. With Technical And Operational Parameters Not Worse Than Those Referred To In The Description Of The Subject Of The Order. The Bill Of Quantities Attached To The Swz Is Of An Auxiliary Nature. The Contractor Is Obliged To Carefully Check The Number Of Works Against The Technical Documentation And Stwiorb. Due To The Fact That The Contract For Construction Works Is A Lump Sum Contract,
Contact Information
Address
Kamienica Polska Commune,Kamienica Polska,42-260,Śląskie,Pl224 - Częstochowski
Contact No.
343273338
Email
poczta@kamienicapolska.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 119515653
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.