Subject Of The Order: Investment Entitled: Energy Efficiency Of Public Utility Facilities In The Milicz Commune: Primary Schools In Dunkowa And Wziąchowo Wielkie. Project Titled Energy Efficiency Of Public Utility Facilities In The Milicz Commune: Primary Schools In Dunkowa And Wziąchowo Wielkie, Implemented Under The European Funds For Lower Silesia 2021-2027 Strategy Of Other Territorial Instrument Of The Southern Wrocław Subregion. Part 1: Reconstruction Of A Public Building In The Town Of Wziąchowo Wielkie - Primary School In Wziąchowo Wielkie. Location: H.E. Milicz, Wziąchowo Wielkie District, Am1, Dz. 52/1 And 52/2 The Subject Of The Construction Project Is Thermal Modernization Of The Primary School. Wanda Rutkiewicz In Wziąchów Wielki. Scope Of Works: • Construction Of A Concrete Band Around The Buildings; • Waterproofing And Thermal Insulation Of Foundation Walls; • Thermal Insulation Of External Walls; • Replacement Of Windows And Doors As Well As Internal And External Window Sills; • Thermal Insulation Of Ceilings; • Thermal Insulation And Replacement Of The Roof Covering; • Replacement Of Gutters And Downspouts; • Modernization Of Internal Heating And Hot Water Installations. And Ventilation; • Installation Of A Ground Heat Pump; • Installation Of Photovoltaic Panels; • Renovation Of Existing Chimneys; • Construction Of Roofs Over The Entrances; • Renovation Of Internal Stairs And Entrance Platforms; • Demolition Of The Smoke Chimney Along With Documentation And Arrangements In This Regard; • Lpg Tank Installation With A Capacity Of 4.85 M3 With Internal And External Gas Installations; • Internal Electrical Installations, Surge Protection, Electric Shock Protection. The Exact Scope Of Both Investments Can Be Found In The Documentation Prepared By The Design Unit: San-Klim Sp. Z O. O. Street Henryka Siemiradzkiego 16, 33-300 Nowy Sącz (Which Constitute Annex No. 12 To The Specification). Solutions In The Sanitary And Electrical Industries Should Be Considered According To The Documentation From 2026 Due To The Updated Solutions. Moreover, The Scope Of Both Investments Includes: - Liquidation - Dismantling Of Parts Of The Existing Installation (Including Air Conditioning), - Finishing, Repair And Reconstruction Works As Part Of Thermal Modernization. - Commissioning Of The Installation, Training Of Employees In The Field Of Operation, Completion Of All Formalities Necessary For The Proper Functioning Of The Installation. Additional Conditions Of Implementation Orders And Schedule Of Works: 1. Carrying Out Works In A Used Facility (Active School). The Contractor Acknowledges That All Construction And Assembly Works Will Be Carried Out In An Active School Facility Where Teaching And Educational Activities Take Place. The Implementation Of The Investment Cannot Disturb The Work Of The School, And The Contractor Is Obliged To Take This Fact Into Account When Preparing A Detailed Material And Financial Schedule.2. Replacement Of External Joi
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 119515119
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.