Quotation are invited for G Station and E Phase 3 Seawater Intake Area Seashell Removal Work during Annual Outage. G STATION BLOCK#10,BLOCK#20 AND E PHASE#3 SEAWATER INTAKE FORBAY, DRUMSCREEN AREA AND PUMP SUCTION PIT DESILTING WORKS.SCOPE OF WORK :1.#DUE TO CONTINUOUS FLOW OF SEA WATER TO THE PLANT, THERE ISACCUMULATION OF SEASHELLS AND SLUDGE IN THE FORE BAY, DRUM SCREEN AREA AND PUMP BAY OF THE PLANT, THE DEPOSIT ARE ESTIMATED TO BE AROUND 50-80M3, CONTRACTOR SHALL DEPLOY MANPOWER AND MATERIAL FOR REMOVAL OFSEASHELL AND SILT WITHIN STIPULATED TIME PERIOD OF 10 DAYS. THECONTRACTOR WILL ALSO BE REQUIRED TO CLEAN THE GROOVES OF THE LOG G ATESFOR TW SCREENS, PUMP PITS, FORE BAY ISOLATIONS. THIS WILL BE CONSIDEREDAS A PART OF THE CONTRACT ONE UNITS CONSIST OF TWO DRUM S CREENS AREA.2.#IT IS CONTRACTOR RESPONSIBILITY TO ARRANGE ALL TOOLS AND TACKLESALONG WITH LIFTING TOLLS AND BASKETS TO REMOVE THE SE ASHELL ANDCONTRACTOR SHALL BE ABLE TO MOBILE WITHIN SHORT PERIOD 2-3 DAYS OF TIME.3.#BEFORE STARTUP OF THE JOB CONTRACTOR HAS TO ISS UE THE METHOD OFSTATEMENT AND RISK ASSESSMENT.4.#DEWA WILL PROVIDE NECESSARY STOP LOGS AND CRANE FACILITY.5.#THE BIDDER IS EXPECTED TO VISIT THE SITE AND FAMILIARIZE HIMSELF OFTHE REQUIREMENTS BEFORE SUBMITTING THE BID.6.#SAFETY OF THE PERSONS WORKING FOR THIS CON TRACT IS THERESPONSIBILITY OF THE CONTRACTOR. AT ANY STAGE WORK, IF CONTRACTOR FOUND VIOLATING THE SAFETY AND ENVIRONMENTAL REGULATI ONS, DEWA HAS A RIGHT TO STOP THE JOB UNTIL SATISFACTORY ACTION IS TAKEN. THERESHALL BE NO COMPENSATION PAID TO THE CONTRACTOR FOR T HE DELAY OCCURREDIN SUCH CIRCUMSTANCES.7.#FOR FURTHER ANY CLARIFICATION PLEASE FEEL FREE TO CONTACT MR.MAHFUZ, 0551901004/048044921 Qty: 1 G STATION BLOCK#10,BLOCK#20 AND E PHASE#3 SEAWATER INTAKE FORBAY, DRUMSCREEN AREA AND PUMP SUCTION PIT DESILTING WORKS.SCOPE OF WORK :1.#DUE TO CONTINUOUS FLOW OF SEA WATER TO THE PLANT, THERE ISACCUMULATION OF SEASHELLS AND SLUDGE IN THE FORE BAY, DRUM SCREEN AREA AND PUMP BAY OF THE PLANT, THE DEPOSIT ARE ESTIMATED TO BE AROUND 50-80M3, CONTRACTOR SHALL DEPLOY MANPOWER AND MATERIAL FOR REMOVAL OFSEASHELL AND SILT WITHIN STIPULATED TIME PERIOD OF 10 DAYS. THECONTRACTOR WILL ALSO BE REQUIRED TO CLEAN THE GROOVES OF THE LOG G ATESFOR TW SCREENS, PUMP PITS, FORE BAY ISOLATIONS. THIS WILL BE CONSIDEREDAS A PART OF THE CONTRACT ONE UNITS CONSIST OF TWO DRUM S CREENS AREA.2.#IT IS CONTRACTOR RESPONSIBILITY TO ARRANGE ALL TOOLS AND TACKLESALONG WITH LIFTING TOLLS AND BASKETS TO REMOVE THE SE ASHELL ANDCONTRACTOR SHALL BE ABLE TO MOBILE WITHIN SHORT PERIOD 2-3 DAYS OF TIME.3.#BEFORE STARTUP OF THE JOB CONTRACTOR HAS TO ISS UE THE METHOD OFSTATEMENT AND RISK ASSESSMENT.4.#DEWA WILL PROVIDE NECESSARY STOP LOGS AND CRANE FACILITY.5.#THE BIDDER IS EXPECTED TO VISIT THE SITE AND FAMILIARIZE HIMSELF OFTHE REQUIREMENTS BEFORE SUBMITTING THE BID.6.#SAFETY OF THE PERSONS WORKING FOR THIS CON TRACT IS THERESPONSIBILITY OF THE CONTRACTOR. AT ANY STAGE WORK, IF CONTRACTOR FOUND VIOLATING THE SAFETY AND ENVIRONMENTAL REGULATI ONS, DEWA HAS A RIGHT TO STOP THE JOB UNTIL SATISFACTORY ACTION IS TAKEN. THERESHALL BE NO COMPENSATION PAID TO THE CONTRACTOR FOR T HE DELAY OCCURREDIN SUCH CIRCUMSTANCES.7.#FOR FURTHER ANY CLARIFICATION PLEASE FEEL FREE TO CONTACT MR.MAHFUZ, 0551901004/048044921 Qty: 1 STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332602596)/$value
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 119514531
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.