|
The Subject Of The Public Procurement Is Major Roof Repair And Implementation Of Energy Efficiency Measures In The Two-Story Building Of The Georgi Benkovski Primary School With Cadastral Number 80902.249.484.1 And Major Repair Of A Staircase Leading To The School Building, In Pi 80902.249.484, Upi I-For School, Quarter 31, Cherni Vit Village, Municipality. Teteven. The Subject Of This Order Is The Execution Of Construction And Assembly Works (Smr) For The Repair And Energy Renovation Of An Existing Building, Covering Three Technological Parts — Architectural And Construction, Heating (Hvac) And Electrical, In Volume And Quantities According To The Attached Ccc. The Scope Of Works Resulting From The Ccc Is Structured As Follows:Part Architecture — Dismantling And Replacement Of Facade Windows (Basement And Under-Roof Space), Replacement Of An Interior Door With An Ei 60 Fire-Resistant Door, Implementation Of A Thermal Insulation System On Facade Walls, Sides And Plinth, Facade Plasters, Complete Renovation Of The Roof Structure And Roof Covering, Thermal Insulation On The Floor Of The Unusable Under-Roof Space, Sheathing Of Galvanized Sheet Metal, Water Drainage (Gutters And Downspouts), Repair Of Chimneys, Repair Of External Stairs And Removal Of Construction Waste.Part Heating Installation (Hvac) - Delivery And Installation Of 3 Pcs. High-Temperature Air-Water Heat Pumps With Refrigerant R290 (Monobloc) With Hydro Modules, Buffer Vessels, Expansion Tank, Circulation Pump, Piping Made Of Galvanized Press Pipes With Thermal Insulation, Shut-Off And Regulating Fittings, Balancing, Aluminum Radiators With Thermostatic Valves, Power Supply Panel For The Heat Pumps, Hydraulic And Hot Test, Start-Up And Adjustment.Part Electric - Dismantling Of Existing And Installation Of New Led Lighting Fixtures, Construction Of A Lightning Protection Installation With An Active Lightning Arrester With Anticipatory Action, Current Arresters, Grounding Installation, Control And Revision Boxes, Lightning Counter And Control Measurements. A Detailed Description Of All Planned Activities Is Contained In The Technical Specification Attached To The Documentation.
|