|
1. Name Of The Order: Construction Of A Tennis Court Complex In Tomaszów Mazowiecki.2.The Subject Of The Order Includes The Execution Of Construction Works Consisting Of: 1) Construction Of A Complex Of Tennis Courts (4 Courts And A Hardened Training Field With A Clay Surface), 2) Construction Of A Container Facility, 3) Construction Of Hardenings And A Parking Lot, 4) Construction Of Field Stairs, 5) Delivery And Installation Of Small Architecture Elements (Benches, Waste Bins), 6) Delivery And Installation Of Mobile Stands, 7) Construction Of A Fence - Ball Catchers, 8) Construction Of A Sewage System Sanitary, Rainwater And Drainage,9) Construction Of Water Supply And Irrigation Installations,10) Construction Of Electrical Installations,11) Construction Of Heating Installations,12) Construction Of Area Monitoring Installations.3.Basic Characteristics Of The Facility:1) The Project Includes The Construction Of Sports Facilities, Communication Routes, Parking Spaces, Sanitary And Cloakroom Facilities As Well As Equipment And Landscaping Elements, Creating A Functional And Coherent Sports And Recreation Complex.2) The Investment Should Include: A) Four Outdoor Tennis Courts With A Clay Surface, Including One Court Equipped With Stands For Spectators, B) A Training Warm-Up Field With A Clay Surface. Brick With A Tennis Wall, C) A Container Facility With Sanitary And Cloakroom Facilities Intended To Serve Users Of The Complex, D) Hardened Entrances And Communication Routes Providing Access To All Designed Facilities, E) Parking Spaces For Passenger Cars, Including Spaces Intended For People With Disabilities, F) Landscaped Green Areas And Biologically Active Areas, G) A 6.0 M High Fence Of The Complex In The Form Of Barrier Nets, Along With Gates And Gates Enabling Controlled Access To The Facility, H) Elements Of Small Architecture, Including Benches, Waste Bins, Judges Stands And Seats At The Courts, I) 5-Row External Stands On Both Sides Of The Southernmost Court Within The Study Area, J) Field Stairs Connecting The Designed Facility With The Existing Parking Lot Of The Ice Arena, K) Area Lighting Enabling Safe Use Of The Facility After Dark. 3) The Designed Tennis Court Complex Is Located In An Area Of Varying Height, With A Slope. The Adopted Design Solutions Take Into Account The Existing Topography Of The Terrain, And In Order To Ensure Efficient Communication Between Individual Levels, Off-Road Stairs And Adjacent Pedestrian Routes Were Designed.4) The Project Also Envisages Carrying Out The Necessary Works Related To The Reconstruction And Construction Of Technical Infrastructure, Including Connections And Installations Serving The Designed Facilities, In Accordance With Industry Studies.5) Design Solutions Ensure The Proper Organization Of Pedestrian And Vehicular Traffic, A Clear Functional Layout Of The Complex And Accessibility For People With Special Needs. Needs. The Designed Development Of The Area Takes Into Account The Existing Sp
|