|
The Subject Of The Order Is: Renovation Of Building No. 15 In The Military Complex At Ul. Warszawska 10 Case No.: 48/Zp/Rb/Infr/2026 Type Of Order: Construction Work Main Subject Of The Order: Cpv - 45000000 - 7 (Construction Works) Scope Of Works: 1. Scope Of The Construction Industry: A) Demolition Works• Demolition Of Brick Partition Walls,• Demolition Of Partition Walls Made Of Plasterboards On A Steel Grid,• Carving Out Wooden And Steel Door Frames (Door Joinery) From The Wall,• Dismantling Of Wooden (Panel) Doors,• Tearing Off The Floor Coverings Made Of Stoneware And Ceramic Tiles On Walls And Floors,• Dismantling Of Wooden Plinths On Stairs, • Removing Moldy Plaster, • Tearing Off Carpet Floors, • B) Internal Works: Flooring: • Leveling The Concrete Floor By Milling, • Priming The Concrete Surface With A Self-Leveling Screed, • Laying The Carpet With A Fold On The Wall, • Laying Stoneware Tiles With Dimensions 30X30 And 50X50/60X60 With Plinths On Floors And Stairs, • All Holes (Drains) For Sanitary Facilities In The Basement Should Be Carefully Sealed With Concrete, • Bathroom Equipment In Building No. 2 (Items 240-263 In The Cost Estimate) Of The Highest Quality And Agreed With The User, Walls And Ceilings: • Leveling And Priming, Preparation Of The Surface, • Fungal Removal Of Brick Walls And Ceilings Using The Deep Method (Approx. 3 M2), • Waterproofing Of Sludge, • Gypsum Plasters On The Walls, • Ordinary Indoor Plasters Of Category Iii Made Of Cement And Lime Mortar, • Painting With Emulsion Paint Resistant To Washing And Scrubbing, • Painting With Oil Paint, • Making Mosaic Plaster. Installation Pipes Heating:• Painting With Oil Paint.Windows And Doors:• Installation Of Adjustable Door Frames,• Installation Of Plate Door Leaves,• Partial Replacement Of Seals In Windows,• Adjustment And Possible Repair Of Pvc Windows (Approx. 40 Pcs.),• Painting Of Steel And Wooden Joinery Together With Frames,• Installation Of Roof Windows. External Works:• Cutting Of Clinker Cladding, Leveling The Ground,• Insulation Damp-Proofing Made Of Horizontal And Vertical Sludge, • Preparation Of The Substrate For The Platform Cladding Made Of Clinker Tiles Laid With Glue Using The Usual Method, • Replacement Of Roof Windows, Accompanying Works: • Protection Of Floors And Balustrades With Foil, • Removal And Disposal Of Doors, Carpets, Remains Of Plasterboard Buildings, Rubble, • Tidying Up The Area. General Requirements For The Works: The Contractor Is Responsible For The Quality Of The Works Performed, Their Compliance With The St And The Supervision Inspectors Instructions. Before Dismantling Work Begins, The Rooms Must Be Properly Secured. 2. Scope Of Installation Industry: The Arrangements Contained In The Specification Concern The Performance Of Installation Works In The Renovated Rooms Of The Building In Accordance With The Bill Of Quantities And Include: - Works In The Field Of Water Supply Installation - Replacement Of Worn-Out Water Pipes And Sani
|