|
1. The Subject Of The Order Is The Performance Of Construction Works As Part Of The Task Entitled: Development Of The Park Of Signposts And Mileposts Of Civilization In Witnica.2. A Detailed Description Of The Subject Of The Order Is Specified In The Description Of The Subject Matter Of The Order (Opz), Constituting Annex No. 1 To The Swz, Together With The Design Documentation Constituting Its Integral Part.3. The Scope Of The Order Includes In Particular: 1) Development Of The Sensory Zone, Including The Construction Of A Sensory Path, Surfaces, Planting Of Greenery, Fencing With Gates And Installation Of Devices And Solar Lighting, 2) Development Of The Sports Zone, Including The Construction Of Surfaces, Planting Of Greenery And Installation Of Recreational And Sports Equipment, 3) Development Of The Recreational Zone, Including The Construction Of Paths And Surfaces, Planting Of Greenery And The Installation Of Recreational Equipment, Small Architecture Elements And Lighting Solar Panel, 4) Revalorization And Care Of Park Greenery, Including The Care Of Existing Trees And The Implementation Of New Plantings And Greenery Compositions, 5) Renovation Of The Amphitheater, Including In Particular The Demolition Of The Existing Elements Of The Stage And Stands And The Construction Of New Elements In Accordance With The Design Documentation, 6) Performance Of The Necessary Earthworks, Foundations, Substructures, Edges And Other Accompanying Works Necessary For The Proper Implementation Of The Subject Of The Order, 7) The Contractor Is Obliged To Carry Out Tests Geotechnical Subsoil In The Scope Of The Renovation Of The Amphitheater, 8) Implementation Of Solar Lighting - Delivery And Installation Of 29 Sets Of Solar Lanterns (Including Marking Out The Installation Sites Of The Lanterns In Accordance With The Design Documentation, Excavation And Preparation Of The Ground For Foundations, Delivery And Installation Of Prefabricated Concrete Foundations, Delivery And Installation Of Complete Solar Lanterns With Supporting Structures, Led Luminaires, Photovoltaic Panels, Batteries And Control Systems, Installation, Leveling, Commissioning And Checking The Correct Operation Of Devices, Tidying Up The Area), 9) Preparing As-Built Documentation.
|