The Subject Of The Order Is The Performance Of Construction Works Consisting In The Modernization (Renovation) Of Roads: 1. Modernization Of A Municipal Road In The Town Of Popielin. The Scope Of The Task Includes The Following Works: • Geodetic Measurements • Temporary Traffic Organization • Cutting Of Existing Roadsides To A Level Ensuring Proper Drainage Of Rainwater From The Road And Roadsides To Green Areas • Wearing Course Made Of A Mineral-Asphalt Mixture Ac 11 S Kr1-2 50/70 Gr. 5 Cm (After Previously Sprinkling The Binding Layer With Asphalt Emulsion In An Amount Of At Least 0.5 Kg/M2)• Shoulder Made Of Mechanically Stabilized Crushed Aggregate 0/31.5 Mm Thick. 10 Cm• Height Adjustments Of Existing Crushed Aggregate Entrances• Height Adjustments Of Underground Water And Sewage Fittings (If Necessary)• Post-Construction Surveying Inventory.2.Reconstruction Of The Municipal Road In Lututowo Ul. Lipowa The Scope Of The Task Includes The Following Works: • Geodetic Measurements • Temporary Traffic Organization • Possible Cutting Of Existing Roadsides To A Level Ensuring Proper Drainage Of Rainwater From The Road And Roadsides To Green Areas • Wearing Course Made Of Mineral And Asphalt Mixture Ac 11 S Kr1-2 50/70 Gr. 5 Cm (After Previously Sprinkling The Crushed Aggregate Base With Asphalt Emulsion In An Amount Of At Least 0.5 Kg/M2)• Crushed Aggregate Base 0/31.5 Mm With A Total Thickness Of 20 Cm (It Is Recommended To Lay The Base In Two Layers) • Layer Of Cement-Stabilized Soil Rm = 2.5 Mpa Thick. 15 Cm• Profiling, Leveling, Filling Any Gaps And Compacting The Existing Surface• Shoulder Made Of Mechanically Stabilized Crushed Aggregate 0/31.5 Mm Thick. 10 Cm• Height Adjustment Of Existing Crushed Aggregate Entrances To The Border Of The Road• Height Adjustment Of Underground Water And Sewage Fittings (If Necessary)• Post-Construction Surveying Inventory.3.Modernization Of The Municipal Road Ul. Market Square In Lututów The Scope Of The Task Includes The Following Works: • Mechanical Cutting Of Joints In The Surface Made Of Mineral-Bituminous Masses, Cutting Depth 6 Cm, • Dismantling The Surface Made Of Mineral-Bituminous Mixtures, Surface Thickness 5 Cm, • Dismantling The Surface Made Of Crushed Stone, 5 Cm Thick, • Removal Of Rubble And Demolition Materials, • Making A Surface Made Of Crushed Stone - Upper Layer 5 Cm Thick, • Making The Surface With Bituminous Mineral Mixtures - Asphalt Wearing Layer, 5 Cm Thick, • Sprinkling The Road Surface With Asphalt, • Transporting The Mineral And Bituminous Mixture From The Plant To The Place Of Installation.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 119457299
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.