|
1. The Subject Of The Order Is The Reconstruction Of A Municipal Road In The Zaleszany Commune In The Town Of Zbydniów With A Length Of 0.937 Km. The Scope Of Work Includes: - Measurement Works (Reconstruction Of The Route And Height Points Of 0.937 Km, As-Built Inventory); - Removal Of Trees, Shrubs, Topsoil And Demolition Works (Mechanical Removal Of A Layer Of Fertile Soil (Topsoil), Layer Thickness 10 Cm - 70.90 M3, Dismantling Of The Crushed Aggregate Base, Layer Thickness 15 Cm (Roadway At Km 0+113.15 - 0+205.00) - 404.00 M2, Dismantling The Asphalt Concrete Surface, Pavement Thickness 8 Cm (Roadway Km 0+113.15 - 0+205.00) - 404.00 M2, Removal Of Rubble); - Sub-Base (Construction Of A Roadbed Mechanically, Together With Profiling And Compaction Of The Subsoil Over The Entire Width Of The Road And Sidewalks In Soils Of Categories Ii-Iv, Performed With A Grader, Depth Of The Bed 11 Cm (Shoulder) - 556.00 M2, Construction Of A Trough Mechanically, Together With Profiling And Compaction Of The Subgrade Over The Entire Width Of The Road And Sidewalks In Soil Categories Ii-Iv Made With A Grader, Bed Depth 29 Cm (Road Km 0+113.15 - 0+205.00) - 314.00 M2, Mechanical Cleaning Of Bituminous Construction Layers, Sprinkling The Construction Layers With Asphalt Emulsion - Bituminous Layers Mechanically, Making The Base From Crushed Aggregate Fraction 0-31.50 Mm, Upper Layer, Layer Thickness 25 Cm (Roadway At Km 0+113.15 - 0+205.00) - 314.00 M2, Roadside Made Of Crushed Aggregate, Layer Thickness 15 Cm - 1,279.00 M2); - Surfaces (Height Adjustment Of Existing Hardened Areas Made Of Crushed Stone, Upper Layer, Thickness 4 Cm, Surface Made Of Ac16w Asphalt Concrete, Binding And Reinforcing Layer, Thickness 4 Cm, (Roadway At Km 0+113.15 - 0+205.00) – 314.0 M, Surface Made Of Ac11s Asphalt Concrete, Wearing Course, Thickness 4 Cm (Road) – 3,838.00 M, Surface Milling Cold Asphalt, Height Adjustment Of Existing Exits And Area Hardening Made Of Concrete Paving Stones (Repaving), In Order To Adapt To The Grade Of The Road Being Reconstructed, Placing A Reinforcing Mesh On The Edge Of The Connections Of The Existing And New Surface With A Strength Of Over 80 Kn/M (Overlay + Strips At The Connections Of The Surface Of 1 M On The Old Binding Surface), - Road Greenery (Renovation Of Greenery On Flat Areas - Construction Of Carpet Lawns With Prior Topsoiling). Horticultural Peat With A 5 Cm Thick Layer)2. A Detailed Description Of The Subject Of The Contract Is Included In Chapter Iv. Description Of The Subject Of The Order In The Swz.
|