1) Part I: Delivery Of Furniture To The Day Support Center Building3.The Subject Of The Order Is The Delivery Of Furniture, Small Equipment, Household Appliances, Tv And Fitness Equipment To The Building Of The Day Support Center, Which Is Located In Kazimierzów.4.The Scope Of The Order For Part I Includes The Purchase And Delivery Of Brand New Furniture And Small Equipment Along With The Costs Of Transport, Unloading And Assembly In Accordance With Opz - Annex 7A7.The Contractor Will Deliver Furniture, Furnishings And Equipment Using His Own Transport At His Own Risk And Expense. The Contractor Is Responsible For The Delivery, Bringing, Assembly, Disposition And Disposal Of All Types Of Packaging After The Supplied Equipment.8.The Detailed Material Scope Of The Subject Of The Order Is Specified In The Detailed Description Of The Subject Of The Order Constituting Annex No. 7 A-C Of The Contract Template Constituting Annex No. 6 To The Swz And This Swz.9.The Ordering Party Informs That The Parameters Of The Delivery Item Presented In The Order Documentation Should Be Treated As Minimal. The Ordering Party Allows Deviations From The Minimum Parameters Specified In The Purchase And Delivery Specifications, Provided That The Parameters Of The Proposed Assortment Are Better Than Those Designed (E.G. Improved Functionality, Possibility Of Better Positioning Of Furniture Equipment In Rooms, Better Durability, Strength, Change In Color, Change In The Shape Of The Equipment). The Condition For Consent To A Derogation Is The Acceptance Of The Ordering Party. 10. After Selecting Its Offer As The Most Advantageous And Before Signing The Contract, The Contractor Should Present The Proposed Equipment For The Ordering Partys Approval, Including The Colors Along With The Unit Price Of Each Piece Of Equipment And An Indication Of The Number Of Items Purchased. Together With The Presented Equipment Proposal, The Contractor Submits Documents Confirming That The Offered Product Meets The Requirements Described In The Swz. 11. In Each Case Of Using Standards, Technical Assessments, Technical Specifications And Technical Reference Systems Referred To In Art. 101(1) 1 Point 2 And Section 3 Of The Public Procurement Law, The Contractor Should Assume That Such A Reference Is Accompanied By The Words Or Equivalent. If References To Standards, European Technical Assessments, Approvals, Technical Specifications And Technical Reference Systems Are Used In The Documentation Describing The Subject Of The Order, The Ordering Party Allows Solutions Equivalent To Those Described. When Analyzing The Design Documentation, The Contractor Should Assume That Each Reference Used In The Documentation Describing The Subject Of The Contract Is Accompanied By The Word Or Equivalent.12.If Trademarks Are Used In The Documentation Describing The Subject Of The Order, It Means That They Are Provided As Examples And Define Only The Minimum Expected Quality Parameters And The Required Standard.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 119457103
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.