The Scope Of The Order Includes Comprehensive Execution Of Construction Works Together With Accompanying And Temporary Works, Consisting In The Construction Of The Ocr (Obstacle Course Racing) Ninja Park Training Ground In Tychy At Ul. Olchowa (Plot 662/2). Construction Works Should Be Carried Out On The Basis Of: · Design Documentation And Stwior By Studio S1 Sp. Z O. O. 43-300 Bielsko-Biała, Ul. Lubelska 22, · Tree Protection Project With An Inventory Of Existing Trees, Designed By Pracownia Samara Magdalena Wysmyk. The Scope Of The Task Includes, Among Others: • Purchase And Installation Of Exercise Equipment: O Large Exercise Cage (1 Pc), O Low Exercise Cage (1 Pc), O Inclined/Straight Wall With Ropes (1 Pc), O Foldable Beam (1 Pc), O Straight Beam (1 Pc); • Execution A Safe Surface Made Of Overgrowth Mats;• Construction Of A Hardened Access Road Made Of Concrete Cubes With A Border;• Construction Of Earthen Terrain Obstacles With A Height Of 0.5-1.0 M;• Purchase And Installation Of Small Architecture Elements: O Benches (3 Pcs.), O Bicycle Racks (2 Pcs.), O Waste Bins (2 Pcs.), O Information Board (1 Pc.);• Topsoil And Sowing Of The Adjacent Area;• Cutting Down Trees (2 Pcs.) And Shrubs (2 Pcs.);• Planting;• Surveying Services, Research, As-Built Documentation. The Contractor Is Obliged To Complete The Subject Of The Order By December 21, 2026. Due To The Need To Complete The Task Carried Out Under The Citizens Budget By The End Of This Year, It Is Necessary To Settle It By December 31, 2026. The Ordering Party Requires The Employment Of A Contractor Or Subcontractor. Based On The Employment Relationship Of All Persons Performing Construction Works Under The Supervision Of The Construction Manager.1. If The Documentation Indicates Trademarks, Patents Or Origin, Source Or Specific Process That Characterizes The Products Or Services Provided By A Specific Contractor, The Ordering Party Allows The Use Of Materials Equivalent To Those Described.2. If The Description Of The Subject Of The Contract Includes References To Standards, Technical Assessments, Technical Specifications And Technical Reference Systems Referred To In Art. 101 Section 1 Point 2 And Section 3 Of The Public Procurement Law, The Ordering Party Allows Solutions Equivalent To Those Described.3. If The Procurement Documents Indicate Trademarks, Patents, Manufacturer Or Specific Origin Of The Product, It Should Be Assumed That These Items Include The Wording Or Equivalent.4. A Contractor Who Refers To Equivalent Solutions Is Obliged To Demonstrate That The Solution He Offers Meets The Requirements Specified By The Ordering Party. In Such A Case, The Contractor Attaches To The Offer Documents Confirming The Equivalence Of The Offered Solutions. The Burden Of Proving Equivalence Rests With The Contractor. The Contractor Shall Demonstrate Equivalence By Any (Reliable) Means. Failure To Demonstrate Equivalence Results In Rejection Of The Offer As Inconsistent With The Terms Of The Ord
Contact Information
Address
Municipality Of Tychy,Tychy,43-100,Śląskie,Pl22c - Tyski
Contact No.
+48327763808
Email
zamowienia@umtychy.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 119389877
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.