|
The Subject Of The Order Is The Performance Of Construction Works Consisting In Comprehensive Energy Thermal Modernization Of Public Buildings In The Kosakowo Commune, For The Facility: Kindergarten Building In Rewa Ul. Koralowa 1, In Accordance With The Design Documentation Attached To The Procedure, Authored By Biuro Projektowe Corematic Engineering Sp. Z O.O.2. The Subject Of The Order Includes Comprehensive Thermal Modernization Works Of The Kindergarten Building In Rewa At Ul. Koralowa 1:1) Construction Works In The Field Of Insulation Of External Partitions And Replacement Of Windows And Doors: A) Insulation Of External Walls - Dismantling Works, Filling Of Gaps, Insulation With 10 Cm Thick Eps Polystyrene, Execution Of Facades In Thin-Layer Colored Plaster. 1.5 Mm, Installation Of Window Sills Made Of Galvanized And Coated Sheet Metal, Installation Of Gutters And Downpipes And Other Sheet Metal Work. B) Replacement Of Window And Door Joinery - Replacement Of Window Joinery With Pvc. Heat Transfer Coefficient Ukmax ≤ 0.9 W/M2k For The Entire Window Set (According To Wt 2022 Requirements); Replacement Of The Buildings External Entrance Doors With Glazed, Anti-Burglary Aluminum Ones – Class Rc2. Woodwork To Be Replaced In Accordance With The Drawing Of The Door Joinery To Be Replaced. Heat Transfer Coefficient Ukmax ≤ 1.3 W/M2k. The Door Is Equipped With A Lock And A Door Closer. C) Insulating The Floor On The Ground - Dismantling The Existing Surfaces, Cutting Off The Existing Floor Layer To Approx. 35 Cm For The Purpose Of Insulation, Making New Floor Layers, D) Insulating The Unventilated Flat Roof - Carrying Out Demolition Works, Drying And Cleaning The Ground, Laying Styrofoam Boards Laminated On One Side With Thick Felt. 20 Cm, Laying Roofing Felt In Two Layers, Performing Sheet Metal Work, Roof Drainage, Finishing Chimneys.E) Dismantling And Rebuilding The Lightning Protection System - Under A Layer Of New Insulation.F) Removal And Disposal Of Rubble.2) Replacement Of The Central Heating Installation. Disassembly Of Valves, Radiators, Piping; Installation Of New Levels, Risers, Radiator Branches, Panel Radiators, Valves With Thermostatic Heads, Hpl Board Housings, Regulation.3) Reconstruction Of The Domestic Hot Water Installation. Dismantling Works Of Bathroom Fittings, Existing Hot Water Installation, Cutting Grooves For A New Installation, Installation Of A New Installation, Reconstruction, Tiling And Repainting Of Walls And Ceilings To The Extent Necessary.4) Replacement Of Lighting Fixtures With Led Fixtures. Disassembly Of Lighting Fixtures And Installation Of New Ones In Led Technology, Including Basic, Emergency And Evacuation Internal Lighting.5) Installation Of An Air-Water Heat Pump. Disassembly Of The Boiler. Gas, Installation Of Devices And Equipment For A New Heat Source In The Form Of A Split Air-Water Heat Pump (Outdoor And Indoor Units), Electrical Work To Connect The Devices, Separation Of A Technical Room With Gkf Bo
|